Similar Projects
G V Kirk Middle School Water Fountain Replacements
Bidding
Newark, DE 19713

Cheswold Water Main Extension/Fire Protection
Post-Bid
Cheswold, DE 19936

Pilottown Road Sewer and Water Improvements
Post-Bid
Lewes, DE 19958

Shallcross Avenue Sewer Separation
Results
Wilmington, DE 19801

Columbia Avenue Water Main Replacement
Results
Dover, DE 19901

Western Sussex Transmission Facilities: Route 13 Force Main Project
Construction
DE

Cured in Place Pipe Lining Service
Post-Bid
New Castle, DE 19720

FY20 Inflow and Infiltration Project
Results
Dover, DE 19904

H--Replacement SPS RO Water Filtration Sources Sought
Post-Bid
Wilmington, DE 19805

North Shores Water Meter Replacement Project
Results
Rehoboth Beach, DE 19971

Dover Air Park Water Distribution System Ugrades
Renovation
Post-Bid
Dover, DE 19901

Delaware Avenue Water Main Replacement
Results
Laurel, DE 19956

High Pressure Hose Replacement
Post-Bid
Dover, DE 19902

Robinsonville Road Core Infrastructure
Results
$1,635,126 est. value
Georgetown, DE 19947

Marshalton Heights Water Main Renewal
Renovation
Post-Bid
Marshallton, DE

Last Updated 03/12/2020 03:20 PM
Project Title

Route 13 North Water Extension

Physical Address View project details and contacts
City, State (County) Seaford, DE 19973   (Sussex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the following: furnishing and installing approximately 3,438 linear feet of 16-inch PVC water main, 265 linear feet of 10-inch PVC water main, two (2) water services complete with curb box and meter pit, three (3) 16-inch gate valves, one (1) 10-inch gate valve, four (4) fire hydrants, assemblies, and 6” gate valve, pavement and site restoration and appurtenances. There are two add alternate schedules within the bid. Add alternate schedule 1 is as follows: furnishing and installing approximately 909 linear feet of 16-inch PVC water main, two (2) water services complete with curb box and meter pit, and two (2) fire hydrants, assemblies, and 6” gate valves, and appurtenances. Add alternate schedule 2 is as follows: furnishing and installing approximately 547 linear feet of 16-inch PVC water main, 646 linear feet of directionally drilled 16-inch HDPE water main, two (2) 16-inch gate valves, two (2) water services complete with curb box and meter pit, one (1) water sampling/meter station complete and one (1) fire hydrant, assembly, and 6” gate valve, and appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents