Similar Projects
Tennis Center - Construction - Town of Flower Mound
Infrastructure
Conception
$12,250,000 CJ est. value
Flower Mound, TX 75022

Aberdeen Drive Phase II - Town of Flower Mound
Infrastructure
Conception
$2,100,000 CJ est. value
Flower Mound, TX 75022

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Premier Flex Ponder - Building 10
New Construction - 5,500 SF
Design
$890,000 est. value
Ponder, TX 76259

Admissions Building Foundation Stabilization
Infrastructure
Post-Bid
Denton, TX

Cambria Hotel Northlake Texas
New Construction, Infrastructure - 84,966 SF
Post-Bid
$31,100,000 CJ est. value
Northlake, TX 76262

Annual Requirements Contract for Directional Boring
Term Contract
Results
Arlington, TX

Northlake Estates Phase 3 - Grading Improvements
Infrastructure
Results
TX

Cordeck Building Solutions
New Construction - 34,050 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Denton, TX 76207

Murphy Express #8925 / Crossroads
New Construction, Infrastructure - 5,233 SF
Construction
$1,500,000 CJ est. value
Crossroads, TX 76227

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Frisco Performing Arts Center and Related Facilities
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Frisco, TX 75034

2022-23 Playground Replacements (Cortadera, Wilkerson, Possum) - Town of Flower Mound
Infrastructure
Conception
$750,000 CJ est. value
Flower Mound, TX 75022

Denton State Supported Living Center / Building # 516 & 556
Renovation, Infrastructure - 13,000 SF
Design
$3,332,700 CJ est. value
Denton, TX 76210

Pecan Square Phase 4C Improvements for Clearing and Mass Grading
Infrastructure
Post-Bid
Northlake, TX

Last Updated 03/29/2023 04:37 PM
Project Title

Bluestar / Crosslands Interstate 35 Industrial Development / Sanger

Physical Address View project details and contacts
City, State (County) Sanger, TX 76266   (Denton County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is new construction of a 275-acre industrial development that will have over 5 million square-feet of industrial office space. The first building, a 300,000-Square-foot building, is nearing completion. As of March 29, 2023, the future phases of the project are in planning. No development applications or building permits have been submitted into the City of Sanger. Information regarding architect or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is not expected to begin prior to 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Industrial Warehouse, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents