Similar Projects
MUNI - Dev Plan - Overlook at Kennerly Lake Lot 33A - Taylor Morrison Of Georgia Llc.
New Construction, Infrastructure
Design
$104,166 CJ est. value
Rocky Face, GA 30740

Paving Plan for Dug Gap Elementary School
Infrastructure
Bidding
$150,000 CJ est. value
Dalton, GA 30720

Chipotle (Shell) / Dalton
New Construction, Infrastructure - 2,365 SF
Bidding
$1,400,000 CJ est. value
Dalton, GA 30720

Westside Elementary Paving Project
Infrastructure
Sub-Bidding
$40,000 CJ est. value
Rocky Face, GA 30740

Dalton Parks and Recreation Playground Unit
Infrastructure
Post-Bid
$40,000 CJ est. value
Dalton, GA 30720

Springhill Heights and Pine Valley S/D Sewer Expansion Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Dalton, GA 30720

New Driver Services Center - DALTON
New Construction, Infrastructure - 8,010 SF
Results
$2,360,000 CJ est. value
Dalton, GA 30721

Building and Site Improvements for Dalton High School
Renovation, Infrastructure
Results
Dalton, GA 30720

Qcells Solar Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$2,500,000,000 CJ est. value
Dalton, GA 30720

Essentia Protein Solutions Broth Factory
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Dalton, GA 30720

RFP Construction Manager at Risk - Renovations and Additions to the John Davis Recreation Center
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Dalton, GA 30721

A New Administrative Office Building
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Dalton, GA 30721

Whitfield County Schools Admin Office Building Dalton GA
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Dalton, GA 30721

Mill Creek Riverwalk - Phase II
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Dalton, GA 30720

Concrete Driveway Aprons and Asphalt Parking Lot Repairs
Infrastructure
Post-Bid
$400,000 CJ est. value
Dalton, GA 30720

Last Updated 05/12/2023 03:15 PM
Project Title

Cornerstone Medical Group / Dalton

Physical Address View project details and contacts
City, State (County) Dalton, GA 30721   (Whitfield County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,700,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations and modifications to existing building for use as a family practice medical clinic.

Details

23,711 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents