Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Del Paso Boulevard Road Diet
Infrastructure
Bidding
$3,000,000 est. value
Sacramento, CA 95815

Roadway Excavation, Place Cl2 Ab, HMA and RHMA, and Modify Ramp Meters
Infrastructure
Bidding
$28,000,000 est. value
CA

Modify Ramp Metering Systems
Infrastructure
Post-Bid
CA

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Sierra Highway Sidewalks
Infrastructure
Results
$375,000 est. value
Sacramento, Santa Clarita, CA 91390

Modify Ramp Metering Systems
Infrastructure
Results
$910,000 est. value
Sacramento, CA 95811

MUNI - Design Review - Northpointe Reserve - Dahlin Group
New Construction, Infrastructure
Design
Sacramento, CA 95835

West El Camino Rehabilitation Project
Infrastructure
Bidding
$1,793,000 est. value
Sacramento, CA 95833

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Police Facilities Streetscapes Maintenance
Infrastructure
Results
Sacramento, CA

Construct Two Auxiliary Lanes and Upgrade Four Ramp Metering Systems
Infrastructure, Alteration
Design
$17,583,000 est. value
Elk Grove, CA 95758

Place HMA, Furnish Polyester Concrete Overlay, and Concrete Barrier
Infrastructure
Bidding
$4,490,000 est. value
Sacramento, CA

Design Build - Construct Parking South East Campus
Alteration
Post-Bid
$2,000,000 to $5,000,000 est. value
Mather, Rancho Cordova, CA 95655

Last Updated 07/01/2022 01:07 AM
Project Title

Construction Management, Inspection, and Materials Testing for Arcade Cripple Creek Trail

Physical Address View project details and contacts
City, State (County) Citrus Heights, CA   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Arcade-Cripple Creek Trail Project, formerly known as the Electric Greenway Trail Project, is a 2.9 mile multi-use trail between Sunrise Boulevard and Wachtel Way largely following an existing Sacramento Municipal Utility District (SMUD) electric corridor easement. The Project is located in the city and unincorporated Orangevale, and connects several neighborhoods to seven parks, several schools, and the Sunrise MarketPlace. In addition to a paved multi-use trail, this Project also includes the following elements: A new signalized crossing at Fair Oaks Boulevard; Solar powered pedestrian-scale pathway lighting; New sidewalk, curb ramps, curb, and gutter at various locations;Drainage improvements; Pre-fabricated pedestrian bridges; Retaining walls; Signing and striping; Trail wayfinding signage; Traffic signal modifications; and Landscaping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents