Similar Projects
CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE
Renovation, Alteration
Design
CA

Rehabilitate Pavement
Infrastructure
Design
$33,790,000 CJ est. value
Tulelake, CA 96134

HMA, thermoplastic traffic stripe, cold plane AC pavement, guardrail.
Infrastructure
Bidding
$22,300,000 CJ est. value
Weed, CA 96094

HMA, thermoplastic traffic stripe, cold plane AC pavement, guardrail.
Infrastructure
Bidding
$22,300,000 CJ est. value
Weed, CA 96094

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Weed Elementary School Replacement Campus Inc 2 - Demolition: Buildings J, K, And L
Demolition
Post-Bid
Weed, CA 96094

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Dollar Tree - Store #08645 (Rebid)
New Construction, Infrastructure - 10,080 SF
Construction
$1,200,000 CJ est. value
Weed, CA 96094

Chestnut Street Townhomes
New Construction, Infrastructure
Pending Verification
$9,400,000 CJ est. value
Mount Shasta, CA 96067

Chestnut Street Townhomes
New Construction, Infrastructure
Pending Verification
$9,400,000 CJ est. value
Mount Shasta, CA 96067

Pavement Preservation
Infrastructure
Design
$14,060,000 CJ est. value
Weed, CA 96094

Replace Manufactured Home
Renovation, Infrastructure
Bidding
$450,000 CJ est. value
Mount Shasta, CA 96067

Weed Elementary School Replacement Campus Inc 2 - Abatement: Buildings J, K, And L
Demolition
Post-Bid
Weed, CA 96094

Weed E.S. New Admin / Classroom Building Increment 2 Bid Package WES 2022.2.31.b Earthwork / Concrete
Renovation, Infrastructure
Results
$1,850,000 CJ est. value
Weed, CA 96094

Last Updated 08/12/2023 10:10 AM
Project Title

Weed E.S. New Admin / Classroom Building Increment 2 - Concrete (Bldg Foundation / Slab) Labor Only - REBID

Physical Address View project details and contacts
City, State (County) Weed, CA 96094   (Siskiyou County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents