Similar Projects
Drainage Improvements (Pipe Rehabilitation and Drainage Structure Correction) on I-65
Infrastructure
Bidding
$971,143 CJ est. value
Hanceville, AL 35077

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Resurface and Traffic Stripe West Main Street Old SR-69
Infrastructure
Post-Bid
Cullman, AL

Road Resurfacing
Results
Cullman, AL

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-157 from the Intersection of SR-3 (US-31)
Results
$3,617,037 to $4,420,823 est. value
Cullman, AL

New Welding Shop At Holly Pond High - Cullman County Board of Education
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Holly Pond, AL 35083

New Family/Consumer Science & Ag Facility At Hanceville High - Cullman County Board of Education
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Hanceville, AL 35077

Scrub Seal Surface Treatment, Bituminous Concrete Wearing/ Leveling Layer and Traffic Stripe
Infrastructure
Post-Bid
AL

Reliance Fire Access Road
Results
$517,305 est. value
Cullman, AL

Lunchroom Expansion At West Point Elementary/High - Cullman County Board of Education
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Cullman, AL 35055

Full Depth Reclamation, Bituminous Surface Treatment "KJG" and Traffic Stripe
Infrastructure
Post-Bid
AL

Performing Surface Treatments to Various Roads
Infrastructure
Results
AL

Full Depth Reclamation With Portland Cement of Cullman County Roads
Infrastructure
Post-Bid
AL

Micro Surfacing to Various Roads
Infrastructure
Results
AL

Recycled Asphalt Pavement Millings (RAP)
Infrastructure
Post-Bid
AL

Last Updated 09/23/2022 04:35 AM
Project Title

Resurfacing (Triple Layer Bituminous Treatment), Guardrail Installation, and Traffic Stripe on SR-91

Physical Address View project details and contacts
City, State (County) Hanceville, AL 35077   (Cullman County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,186,308 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Cullman Constructing the Resurfacing (Triple Layer Bituminous Treatment), Guardrail Installation, and Traffic Stripe on SR-91 from the junction of SR-69 to Sullivan Creek (MP 9.180) in Arkadelphia. Length 9.179 mi. The Bracket Estimate on this project is from $914,414 to $1,117,617 . Contract Time: 30 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 023 - Resurfacing (Triple Layer Bituminous Treatment), Guardrail Installation, and Traffic Stripe on SR-91 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents