Similar Projects
Museum of Shenandoah Valley Trails
Post-Bid
Winchester, VA 22601

West Great Neck Road Sidewalk
Post-Bid
Virginia Beach, VA

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Parking and Drive Extension
Results
VA

Sidewalk Trip Hazard Removal
Term Contract
Post-Bid
Buchanan, VA 24066

Pedestrian and Drainage Project
Results
$4,467,755 est. value
Fairfax, VA

Driveway, Slope and Grade Repair-Culpeper
Post-Bid
Culpeper, VA 22701

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Parking Area Upgrades
Post-Bid
Tasley, VA

State HQ Modernization Parking Lot Extension
Results
Richmond, VA 23297

Z--Sidewalk Replacement
Post-Bid
$100,000 to $250,000 est. value
Hampton, VA 23667

Matthew Whaley Elementary School Parking Lot Improvements Project
Results
$472,304 est. value
Williamsburg, VA 23185

FY 20 Concrete Sidewalk, Sidewalk Through Entrance, Curb, Curb and Gutter and Handicap Ramp Removal/Replacement
Post-Bid
Roanoke, VA 24011

Site Repairs and Improvements
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Construction - Repave Parking Lot, Charlottesville VA
Post-Bid
Charlottesville, VA 22903

Reported 05/19/2020 12:00 AM
Project Title

Main Street Enhancement Project

Physical Address View project details and contacts
City, State (County) Orange, VA   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $10,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Project consists of upgrading the existing pedestrian facilities along East Main Street from east of the railroad tracks to the intersection with May Fray Avenue/Byrd Street including pedestrian lighting and pedestrian signal upgrades. Pedestrian lighting along the west side of Byrd Street between East Main Street and East Church Street is also included. Work generally consists of: 1. Concrete sidewalk, curb, driveway and curb ramp replacement 2. Pedestrian signal improvements at the intersection of East Main Street and Byrd Street 3. Pedestrian lighting improvements along East Main Street and Byrd Street 4. Storm drainage improvements along East Main Street 5. Landscaping improvements along East Main Street 6. Signing and pavement marking improvements along East Main Street Major Items of work are identified as: 1. Concrete items 2. Drainage items 3. Pedestrian Lighting items 4. Pedestrian Signal items

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents