Similar Projects
Hiawatha National Forest Toilets
Demolition
Design
Gladstone, MI

Enclosure Construction Services
Renovation
Bidding
$39,450 CJ est. value
Lake Orion, MI 48362

Noise barrier wall repair and high load hit repairs on US-23NB
Infrastructure
Sub-Bidding
$238,000 CJ est. value
Howell, MI 48843

Fire Station 1 Concrete Replacement Program
Post-Bid
Rochester Hills, MI

M-99 Full Depth Concrete Repair
Post-Bid
MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Concrete Services for Various Washtenaw County Buildings
Results
Ann Arbor, MI

Building Number 1000180 Concrete Repairs at Sides of Stage Bidpack 01- Construction
Post-Bid
Ann Arbor, MI

Bus Stop Improvements
Results
Lansing, Okemos, MI 48912

Bus Garage Concrete
Alteration
Post-Bid
Tecumseh, MI 49286

Concrete Materials for Camp Grayling MTC
Results
Grayling, MI

Fabric Membrane Structure
New Construction
Post-Bid
MI

Cement, Annual Estimated Quantities
Term Contract
Results
MI

Kent Lake Dam Concrete Repairs
Alteration
Post-Bid
$100,000 est. value
Huron Beach, MI

Concrete Leveling At Civic Center Pool
Results
Southfield, MI 48076

Last Updated 09/14/2022 11:07 AM
Project Title

2023 Downtown Infrastructure and Streetscape Project

Physical Address View project details and contacts
City, State (County) Allegan, MI 49010   (Allegan County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $7,768,219 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 14 2022, the downtown infrastructure and streetscape project has not been tentatively awarded. This project is expected to be awarded sometime in October. PROJECT ESTIMATE: $5,194,243.50 PROJECT HIGHLIGHTS: Sewer and Water utility construction, roadway reconstruction, electrical and lighting replacement, concrete pavers, stone veneer seatwalls, and landscape plantings. PROJECT DESCRIPTION: Recsonstruction roads, sanitary sewer, storm sewer, and water mains on Brady, Locust, Hubbard, Trowbridge and State Streets in Downtown Allegan. The Project includes sidewalks, landscape plantings, concrete pavers, and site amenities. Debarment Certification, and good faith efforts to retain DBE/MBE/WBE Contractors in each trade. Bids received without the necessary accompanying documentation will be returned to the Bidder, unopened. The Work is scheduled for completion by August 2024.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents