Similar Projects
Ground Water Facility/Re-Pump Station/HVAC and Ventilation System Improvements at Various Locations - Package 2
Renovation, Alteration
Design
Houston, TX

Ground Water Facility/Re-Pump Station/HVAC and Ventilation System Improvements At Various Locations - Package 3
Renovation, Alteration
Design
Houston, TX

Replace Chiller and Cooling Towers Federal Detention Center Houston
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Houston, TX 77002

Lychner 2 12.5-Ton HVAC Units
Alteration
Bidding
Humble, TX 77396

Heating, Ventilation, and Air Conditioning Services
Term Contract
Post-Bid
Houston, TX 77251

HVAC and Mechanical Products
Term Contract
Post-Bid

Duct Bank-William P. Hobby Airport
Results
Less than $100,000 est. value
Houston, TX 77061

Webster HVAC Replacement
Results
Less than $98,450 est. value
Webster, TX 77598

Gessner HVAC Replacement
Alteration
Bidding
$600,000 est. value
Houston, TX 77071

Woodland Acres Middle School HVAC Replacement
Post-Bid
Houston, TX 77015

HVAC Equipment-Statewide
Results
Less than $44,107 est. value

HOU ARSR HVAC and Roof Replacement
Alteration
Bidding
$450,000 to $550,000 est. value
Houston, TX 77034

Administration Building Mechanical Renovations
Post-Bid
$3,000,000 est. value
Houston, TX 77024

OCB AHU and Chiller Replacement
Results
Houston, TX 77054

HVAC Filters
Alteration
Bidding
Klein, TX

Last Updated 06/24/2022 04:27 AM
Project Title

AHU Refurbishment - Phase 3

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Refurbishment of Air Handling Units at Ben Taub Hospital Phase III for the Harris County Hospital District dba Harris Health System. This project includes a phased refurbishment to a total of ten (10) main air handling units serving Ben Taub Hospital: four (4) main heating/ return air handling units AHU-B-1B, AHU-B-2B, AHU-B-3B, and AHU-B-4B located within the Basement Equipment Room; three (3) main heating/ return air handling units AHU-P-1B, AHU-P-2B, and AHU-P-3B located within the Penthouse; and three (3) cooling units AHU-P-1A, AHU-P-2A, and AHU-P-3A, also located within the Penthouse. The work shall be substantially complete within eight hundred and fifty-one (851) calendar days after the date the contract time commences.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents