Similar Projects
Chlorine Dioxide Generators
Renovation
Sub-Bidding
$200,000 CJ est. value
Acworth, GA 30101

Airfield Electrical Rehabilitation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Fitzgerald, GA 31750

Uninterruptible Power Supply (UPS) and Inverter Maintenance Services
Post-Bid
Kennesaw, GA

Replace - Study - Add Generators at Facility 5, 701, 753, 805, 806, 827, 828, 955, 1001, 2012 2021, 2125, 2127, 2174, 2300 and 2313
Term Contract
Post-Bid
Marietta, GA 30067

H930--Atlanta Generator Maintenance & Repair
Results
Decatur, GA 30033

Water Treatment Plant Electrical Upgrades
Alteration
Results
GA

Generator System Maintenance and Repair Services
Alteration
Post-Bid
Atlanta, College Park, Conley, Ellenwood, Fayetteville, Forest Park, Hampton, Jonesboro, Morrow, Rex, Riverdale, GA 30236

LED Panel Lights
Alteration
Results
GA

Central Steam Plant Boiler Controls Replacement and Electrical Upgrades
Alteration
Post-Bid
$4,900,000 est. value
Athens, GA

47500 - Milledgeville Generator
Alteration
Results
Milledgeville, GA 31061

On-Call Electrical Services
Alteration
Post-Bid
GA

Airfield Electrical Replacement
Alteration
Results
$530,870 est. value
Douglas, GA 31535

Annual Commercial Generator Maintenance and Repair Services
Term Contract
Post-Bid
GA

Flocculator Motor Control Center
Alteration
Results
Augusta, GA

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Last Updated 12/29/2022 02:11 PM
Project Title

Well #18 Electrical

Physical Address View project details and contacts
City, State (County) Albany, GA 31707   (Dougherty County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $47,100 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work is contained in the bid documents. This project will be bid on a lump sum basis for all specified work and will be awarded to the lowest responsive and responsible bidder. The City of Albany strongly encourages Small Business firms to participate in this bid. The City of Albany reserves the right to reject any and all bids and to waive any informalities in the bidding process. All corporations should provide the corporate seal, a copy of the Secretary of State Certificate of Incorporation, and a listing of the principals of the corporation with bid. Bid documents, specifications and plans may be inspected at the Procurement Office, 222 Pine Avenue, Suite 260, Albany, Georgia and on the Georgia Procurement Registry. For additional information, contact Ricky Gladney, Buyer, at (229) 302-1455. Submit all questions via email to rgladney@albanyga.gov cc: iswilliams@albanyga.gov. The deadline for questions is October 25, 2022, at 2:30 p.m. The contractor is required within five (5) days of completion of specified work to contact the Project Manager, William "Bill" Holloway at 229-809-6742 for a final inspection. Scope of work: 1. Demo existing electrical in well house once power company disconnects service. 2. Install a 600-amp outdoor disconnect provided by the City of Albany. 3. Install a 15 KVA transformer and low voltage sub panel 4. Replace all lighting with new LED fixtures. 5. Replace all conduit with PVC. Rewire all lights and receptacles per code, motors, heaters, fans. 6. Install a 125Amp Panel 7. Install Emergency Lighting per the schematic. 8. Install new PVC from building disconnect to transformer. 9. Properly dispose of all material after demo. 10. All work must meet or exceed the National Electrical Code. 11. Manufacture's literature: Manufacture's recommendation installation instruction, product warranty information and safety data sheets will be provided by the successful bidder to the project manager. 12. The contractor shall provide all warranty paperwork at the completion of the project. 13. Labor warranty shall be 30 days. 14. All materials shall have minimum warranties equal to industry standards. General: The work to be done is at 2402 Dawson Road in Albany, Georgia described as Well 18 Electrical. This is for the repair/replacement of the electrical components per the 2020 NFPA 70 (NEC 2020) current Georgia State Minimum Standard Electrical Code effective January 1, 2021, the electrical diagram provided is a general guideline and does not negate the previous mentioned code. The contractor is responsible for all permits. The contractor shall keep the work area and adjacent areas clean at all times. Clean up operations shall be conducted on a consistent basis. The contractor shall conduct the construction operations with the appropriate level of care to ensure the safety of the public utilizing the facility. Employees of the contractor and any subcontractors shall be cognizant of the fact that the project is in a residential/commercial area and conduct themselves in an appropriate manner.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents