Similar Projects
Courthouse Renovations
Renovation
Conception
NY

Saint Armand Town Hall ADA Improvements
Renovation
Conception
Bloomingdale, NY 12913

New City Library Addition and Renovation
Renovation, Addition - 23,702 SF
Design
New City, NY 10956

Town Hall Addition and Alterations
Addition
Bidding
Orangeburg, NY 10962

Facade Restoration And Adult Learning Center Roof Repair
Renovation
Bidding
Port Washington, NY 11050

Installation of Accessible Lift for the Town Hall
Post-Bid
$75,000 to $85,000 est. value
Schroon Lake, NY 12870

Wallkill Public Library - Reading Room Addition
Addition
Post-Bid
Wallkill, NY

Court Room and Justice Court Office Renovation
Renovation
Results
Rensselaer, NY

Second Floor Renovations and HVAC Renovations
Renovation
Results
Waterford, NY 12188

Hall of Justice Courtroom Improvements
Construction
Rochester, NY 14614

Crane Branch Library Reconstruction Phase 1
Renovation
Construction
Buffalo, NY 14202

Pace University Academic Center & Dormitory
New Construction - 213,084 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY

Crane Branch Library Renovations - Phase 2
Renovation, Addition
Bidding
Buffalo, NY 14222

Pirnie Fire Alarm Construction
- 93,646 SF
Post-Bid
$500,000 to $1,000,000 est. value
Utica, NY 13501

Public Library Bathroom Renovation
Renovation
Results
Pelham, NY 10803

Reported 01/15/2022 12:00 AM
Project Title

Investigative Probes for Village Hall and Library

Physical Address View project details and contacts
City, State (County) Hastings-on-Hudson, NY 10706   (Westchester County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall, Library - Public
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 12/24/21
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes investigative probes to provide information on the condition of the parapets, masonry and concrete structures, and concrete reinforcement and to allow for the documentation of the existing structural framing of the Village Hall and Library roofs. Probe #1-4a: Parapet Wall and Roof Deck Intersection Remove a 2’-0” x 2’-0” area of the stucco coating on the vertical parapet surface and remove three courses of brick masonry within the probe area. Create a 2’-0” x 2’-0” opening in the horizontal roof membrane and deck and remove the copper base flashing at the vertical parapet surface. Scope: Requires removal of interior parapet stucco coating and base flashing to expose face masonry at parapet and further removal of three courses of brick masonry above the roof deck from the innermost wythe of the parapet wall. Also requires removal of roofing membrane, insulation, and wood deck to expose the roof framing members. Allow for Architect inspection of the bearing conditions and the interface of the masonry and decking, and documentation of the size, spacing, and condition of the wood framing. All probe locations are to be closed at the conclusion of investigation and made watertight. Replace removed decking and seal openings with liquid-applied membrane. Reinstall base flashing and patch stucco finish with new Sto stucco coating. Probe #4b: Parapet and Portico Roof Deck intersection Remove 2’-0” x 2’-0” area of roofing membrane and deck adjacent to scupper to expose portico roof framing. Remove three courses of brick masonry within the probe area. Area of removal to be directly opposite Probe #4a across the parapet. Note that opposite scupper from the one indicated in the probe plan can be selected for probe based on potential for secure access and required tie-off points at main roof. Scope: Requires removal of roofing membrane, insulation, and wood deck to expose the portico roof framing members. Remove three courses of brick masonry from the exterior wythe of the parapet wall adjacent to the scupper. Note that brick removal must not be done in tandem with masonry removal specified for Probe #4A. Allow for Architect inspection of the bearing conditions and the interface of the masonry and decking, and documentation of the size, spacing, and condition of the wood framing. All probe locations are to be closed at the conclusion of investigation and made watertight. Replace removed decking and seal openings with liquid-applied membrane. Replace areas of brick masonry removal with new brick units to match existing. Easton Architects to approve sample of proposed replacement brick during probe work prior to the closing of the probe area. Probe #5: Brick Mortar Sampling & Patching Remove six linear inches of brick mortar from main facade. Scope: Requires removal of six linear inches of brick mortar from location(s) indicated by Architect in the field. Repoint areas of mortar removal with new mortar to match the existing. Easton Architects to approve mortar finish color, prior to the completion of the repointing. Probe #6-7 & #10: Concrete Spandrel and Roof Deck Intersection Remove 2’-0” wide area of the stucco coating on the vertical spandrel surface and sound concrete face of spandrel beam. Create a 2’-0” x 2’-0” opening in the horizontal roof membrane above the probe below down to the deck. Scope: Requires removal of 2’-0” wide vertical band of exterior stucco coating along the full height of the spandrel beam and sounding of the underlying concrete beam. If directed by Architect or Engineer, remove a minimal depth of concrete (+/- 1.5” in depth) from face of beam. Remove roof membrane in a 2’-0” x 2’-0” area behind the gravel stop directly above the spandrel probe; requires removal of membrane, insulation, and flashing membranes to expose concrete deck below. At Probe #7, cut back the gravel stop to allow for inspection of the roof edge. Allow for Easton Architects to inspect the structural framing conditions and configurations. All probe locations are to be closed at the conclusion of investigation and made watertight. Apply a bituthene coating to any exposed steel, patch areas of removed concrete, and patch stucco finish with Sto stucco coating. At Probe #7, replace removed sheet metal gravel stop edge and flash into roof repair with liquid flashing membrane. Replace removed roof insulation and seal openings with a liquid-applied membrane. Probe #8-9: Concrete Spandrel Sounding Remove 2’-0” wide area of the stucco coating on the vertical spandrel surface and sound concrete face of spandrel beam. Scope: Requires removal of 2’-0” wide vertical band of exterior stucco coating along the full height of the spandrel beam and sounding of the underlying concrete beam. If directed by Architect or Engineer, remove a minimal depth of concrete (+/- 1.5” in depth) from face of beam. All probe locations are to be closed at the conclusion of investigation and made watertight. Apply a bituthene coating to any exposed steel, patch areas of removed concrete, and patch stucco finish with Sto stucco coating.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents