Similar Projects
Re-Roofing of Existing Buildings
Alteration
Bidding
$1,000,000 est. value
Kinston, NC 28501

Traffic Services Building Roof Repairs
Alteration
Bidding
$600,000 est. value
Castle Hayne, NC 28429

Roofing (Asphalt Shingles)
Post-Bid
Robersonville, NC

Roofing (Metal)
Post-Bid
Robersonville, NC

Re-Roofing of the Margaret Hearne Elementary School
Results
Wilson, NC 27893

DPS - Rockingham Youth Development Center: Roofing
Results
Raleigh, NC 27230

Roof Replacement
Alteration
Bidding
Less than $500,000 est. value
Roseboro, NC 28382

Convention Center Replacement of EPDM Roof Project
Post-Bid
Greenville, NC

Replacement of Roofs Northwoods Park Middle School
Results
Jacksonville, NC 28540

Courthouse/Post Office Roof Replacement
Alteration
Bidding
$30,000 est. value
Chapel Hill, NC

Design Team for Exterior Remediation at A-B Tech
Alteration
Post-Bid
Candler, NC 28715

Juvenile Probation Roof Replacement
Results
Less than $130,485 est. value
Sanford, NC 27330

Re-Roof A and B Buildings at Parkwood Elementary School
Alteration
Bidding
$500,000 est. value
Jacksonville, NC 28540

Southport Elementary Roof Replacement
Post-Bid
Southport, NC 28461

Roof Replacement East Union Middle School Roofs 2.01 and 2.02
Results
Less than $100,000 est. value
Marshville, NC 28103

Reported 05/18/2022 12:00 AM
Project Title

Robert C. Keys Gymnasium Re-roofing

Physical Address View project details and contacts
City, State (County) Wentworth, NC 27375   (Rockingham County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing of labor, material, and equipment to conduct a complete roofing removal and replacement consisting of mechanically fastened roofing insulation, roof drains, recover board, TPO membrane roofing and coping, temporary removal and installation of existing roof top equipment. Scope of work will address pressure cleaning of the existing precast concrete fascia panels. The roof replacement will include Plumbing, HVAC and Electrical Contractors to support the new roof and reinstallation of roof top equipment. All work to be per the project drawings and specifications.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents