Similar Projects
Last Updated | 06/29/2023 02:12 PM |
Project Title | Water Treatment Plant Improvements City of Mackinac Island |
Physical Address | View project details and contacts |
City, State (County) | Mackinac Island, MI 49757 (Mackinac County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $236,650 [brand] Estimate |
Plans Available from | Construction Manager - 05/26/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project as a whole includes improvements to the City's Wastewater Treatment Plant (WWTP), consisting of, but not limited to, a new headworks building, process building, maintenance building, automatic influent screening, septage receiving equipment, grit removal system, flow splitter chambers, chain-and-flight sludge collectors, moving bed biofilm reactors, mechanical tank mixers, ultraviolet disinfection system, submersible pumps, hydraulic gates, screw conveyor, hoists and trolleys, rotary screw blowers, positive displacement blowers, rotary lobe pumps, chopper pumps, chemical feed systems, piping, valves, FRP ferric chloride storage tanks, FRP solid covers, weir plates and scum baffles, overhead coiling doors, aluminum access hatches, plumbing, HVAC, modifications to existing process tanks and biosolids handling, effluent pump station and forcemain, new plant automation and SCADA, electrical, instrumentation, update existing Control Building, site fencing, site restoration and all related work to make a functional system. The following construction contracts will be awarded separately or together in any combination: Contract No. Identification 1 Site Work & Excavation 2 Concrete 3 Precast Concrete 4 General Trades 5 Prefabricated Metal Building 6 Painting 7 Mechanical 8 Electrical, Controls & Instrumentation Each proposal shall be accompanied by a certified check or Bid Bond by a recognized surety in the amount of not less than five percent (5%) of the Bidder's maximum Bid price in accordance with the Instructions to Bidders. Special project requirements include: American Iron and Steel Davis-Bacon and Related Acts/Prevailing Federal Wages Labor Standards Provisions for Federally Assisted Projects Certification Regarding Debarment, Suspension, and Other Responsibility Matters Attendance to one of the two pre-bid conferences is required. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |