Similar Projects
IR 77 - Culvert Replacement
Infrastructure
Bidding
$2,381,207 CJ est. value
Marietta, OH 45750

Bridge Replacement (1 Bridge) - CR 47
Demolition, New Construction, Infrastructure
Bidding
$2,009,275 CJ est. value
Lower Salem, OH 45745

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Four Lane Resurfacing - SR 618-03.22
Infrastructure
Post-Bid
$1,151,543 est. value
OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

Four Lane Resurfacing - WAS-SR 7-24.322
Infrastructure
Results
OH

Slide Repair - SR 821
Infrastructure
Bidding
$821,569 CJ est. value
Lower Salem, OH 45745

Cold Patch, Chip and Seal - Applied Single and Double
Infrastructure
Post-Bid
Barlow, OH

Intersection - SUM-Wooster Road Robinson
Infrastructure
Results
$1,248,937 est. value

Concrete Bid
Infrastructure
Bidding
$300,000 CJ est. value
Reno, OH 45750

Chip and Seal Dust Control
Infrastructure
Post-Bid
Waterford, OH

Bridge Replacement
Infrastructure
Results
$211,910 CJ est. value
Grandview Township, OH 45767

Emergency Landslip Repair Project on County Road 2 (Anderson Road)
Infrastructure
Bidding
$61,968 CJ est. value
Fleming, OH 45729

Resurfacing of Various Waterford Township Roads
Infrastructure
Post-Bid
Waterford, OH

Two Lane Resurfacing - FY2022
Infrastructure
Results
$297,041 est. value
Belpre, OH

Last Updated 04/07/2023 08:07 AM
Project Title

SR 676 - Slide Repair

Physical Address View project details and contacts
City, State (County) Vincent, OH 45784   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $579,896 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

OHDOT - SR 676 - Slide Repair The successful bidder must furnish a performance bond and a payment bond in an amount equal to one hundred percent (100%) of the awarded contract amount.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents