Similar Projects
Last Updated | 12/08/2020 12:15 PM |
Project Title | Westport Parkway from Keller Haslet Road to Alta Vista Road |
Physical Address | View project details and contacts |
City, State (County) | Fort Worth, TX 76102 (Tarrant County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 738 LF 16” PVC C900 Water Pipe; 401 LF 12” PVC C900 Water Pipe; 4 EA Manhole Adjustment, Major with Cover; 1,410 SY 2”-4” Asphalt Pavement; 11,824 SY 10” Concrete Pavement; 43,593 SF 4”-5” Concrete Sidewalk; 2,134 LF 18”-66” Reinforced Concrete Pipe; 101 LF 6’x3’ Reinforced Concrete Box Culvert; 13 EA 10’ Curb Inlet; 2 EA 5’ Drop Inlet; 23 EA Roadway Illumination Poles; 14,117 CY Unclassified Excavation; 1,843 CY Embankment; 179 LF 8” PVC Sewer Pipe; 1 EA 4’ Manhole; 1 EA Septic Tank Leech Field Adjustment; 1 EA Septic Tank Leech Field Adjustment. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |