Similar Projects
Murphy USA #6608 / Stillwater
New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

Bridge and Approaches - SH 51
Infrastructure
Design
$3,710,000 CJ est. value
Stillwater, OK 74074

Bridge and Approaches - SH 51
Infrastructure
Design
$3,710,000 CJ est. value
Stillwater, OK 74074

McElroy Road Pavement Repair
Infrastructure
Bidding
$1,200,000 CJ est. value
Stillwater, OK 74078

McElroy Road Pavement Repair
Infrastructure
Bidding
$1,200,000 CJ est. value
Stillwater, OK 74078

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Asphalt Repairs for OSUIT-Okmulgee
Infrastructure
Post-Bid
Stillwater, OK

Grade, Drain and Surface
Results
OK

Bridge Water Proof Seal
New Construction, Infrastructure
Results

Bridge and Approaches - SH 33
Infrastructure
Design
$16,737,500 CJ est. value
Perkins, OK 74059

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Pavement Rehabilitation - Mill and Overlay
Infrastructure
Results
Stillwater, OK

Grade, Drain, and Surface - US 177
Infrastructure
Design
$5,088,000 CJ est. value
Stillwater, OK 74074

Mill and Overlay
Infrastructure
Results
Stillwater, OK

Widen and Resurface - SH 18
Infrastructure
Design
$5,995,000 CJ est. value
Yale, OK 74085

Last Updated 09/20/2022 08:40 AM
Project Title

Husband Street Boomer Creek Bridge Drilled Pier Installation

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Dock/Pier/Marine, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions regarding this Notice or the bidding documents should be directed to Charles Short, Project Manager, 405-742-8348 or charles.short@stillwater.or g. *The value for this project is based on a financial range of $400,000-$500,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. STR. No. 60N3335E0600005, LOCAL No. 292B Notice to Proceed (NTP) Commencement of Contract Times Notice to Proceed Issued no later than 30 days after Notice of Award is issued. 2 Substantial Completion 60 calendar days from the Notice to Proceed. 3 Final Completion 15 calendar days after substantial completion.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents