Similar Projects
Orville Road Engineered Log Jam Setback Revetment Phase
Infrastructure
Results
$2,000,000 to $4,000,000 est. value
WA

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Rody Creek Channel Stabilization Between 80th Street East and 72nd Street East
Infrastructure
Post-Bid
$900,000 to $1,500,000 est. value
Tacoma, WA 98417

Salmon Creek Cutover
Infrastructure
Bidding
$110,000 est. value
Sumner, WA 98390

92nd Avenue East/224th Street East
Alteration
Results
$2,700,000 to $4,000,000 est. value
WA

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

Special Market Request for Contech Engineered Solutions Services
Infrastructure
Post-Bid
$100,000 est. value
Tacoma, WA

Wapato Creek Diversion Repair
Infrastructure
Bidding
Puyallup, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

CRP 5736 Canyon Road East - 400 ft. n/o of 84th St E to 72nd Street East
Infrastructure
Results
$6,000,000 to $8,000,000 est. value
Tacoma, WA 98417

Carbon River Road Erosion Control Mount Rainier National Park
Infrastructure
Bidding
$250,000 to $500,000 est. value
Carbonado, WA 98323

2022 Stormwater Repair
Infrastructure
Results
$261,000 to $289,000 est. value
Lakewood, WA 98499

Horsehaven Creek Fish Passage Culvert at 188th Street Crossing Project D231
Infrastructure
Results
$686,175 est. value
Frederickson, WA 98375

Foss Waterways Site 10, 12, and Municipal Dock Bulkhead Replacement
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
Tacoma, WA 98402

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Last Updated 05/30/2022 05:07 AM
Project Title

Clear Creek Habitat Restoration - Access Road Removal

Physical Address View project details and contacts
City, State (County) Tacoma, WA   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for wetland-to-stream connection improvements along lower Clear Creek. Work includes temporary traffic control, invasive species contamination prevention, clearing, installation of temporary stream isolation and diversion structures, dewatering and discharge, excavation and offsite haul, placement and anchoring of large woody material, installation of streambed aggregates, temporary erosion control and planting.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Geotechnical Data, Exploratory Excavation Information.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents