Similar Projects
Well and Septic Tank Phase Out Program
New Construction, Infrastructure
Bidding
FL

Replace Fire Pump, Motor, Jockey Pump, Controllers & Transfer Switch
Alteration
Bidding
Miami, FL 33132

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Edgewood Drainage Well Installation - NS069
Infrastructure
Bidding
Ocala, FL 34471

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Raw Water Well #9
Results
Hallandale, FL 33009

Drainage Well Abandonment - LPA0066
Infrastructure
Bidding
Ocala, FL 34475

Well Pump Motor
Post-Bid
Plant City, FL 33564

Well 15 South Profile Well and Remediation Well R-4
Results
Hobe Sound, FL 33455

Well Drilling Services
Alteration
Bidding
Jacksonville, FL 32212

Well Pump Diagnostic for Irrigation System NRCS FL
Post-Bid
Brooksville, FL 34601

FB Potable Water Well 14
Results
Less than $264,480 est. value
Flagler Beach, FL 32135

Last Updated 02/02/2022 07:49 AM
Project Title

Military Point Advanced Wastewater Treatment Facility Pumps and Motors Replacement Project

Physical Address View project details and contacts
City, State (County) Panama City, FL 32403   (Bay County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to replace various pump and motors at the Military Point Advanced Wastewater Treatment Facility. Work shall include but is not limited to all labor and materials needed to remove and replace the existing pumps and motors and perform a startup of the supplied motors and pumps meeting manufacturer requirements to maintain the factory warranty.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents