Last Updated | 04/01/2023 01:02 PM |
Project Title | Mann Valley Corporate Park |
Physical Address | View project details and contacts |
City, State (County) | River Falls, WI 54022 (Pierce County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $13,166,434 [brand] Estimate |
Plans Available from | Architect - 02/23/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Major Quantities Include: 1 LS Mobilization 1 LS Maintenance of Traffic 1 LS Field Office 1 LS Metal Building Removal 23,740 LF 6-inch to 16-inch DIP Water Main 20,000 LB Water Main Fittings 128 EA Gate Valves 42 EA Fire Hydrants 1 EA Water Valve Vault (PRV) 17,880 LF 8-inch to 18-inch PVC Sanitary Sewer Main 57 EA Sanitary Sewer Manhole, 8-Foot Depth 225 VF Sanitary Sewer Manhole, Excess Depth 1 LS Sanitary Sewer Lift Station 2,046 LF Sanitary Sewer PVC Force Main 1 LS Lift Station Control Panel 55 EA Street or Trail Lights and Appurtenances 2 EA Lighting Control Cabinets 2 Acres Clearing and Grubbing 179,900 CY Salvage Topsoil 34,280 CY Common Excavation 6,870 CY Granular Backfill 2,500 CY Rock Excavation 500 LF Temporary Ditch Checks (Bio Roll) 8,500 LF Silt Fence Delivered, Installed and Maintained 38,500 SY Erosion Mat 1,250 SY Articulated Concrete Block 23,840 Ton Crushed Aggregate Base Course 8,990 Ton Asphalt Street, Trail and Driveway Pavement 1,980 Ton Crushed Aggregate Shoulder 8.850 LF Concrete Curb and Gutter 965 LF Pavement Markings - Striping 8 EA Pavement Markings - Arrows 47,77 SY Seeding/Turf Establishment 240 EA Trees 330 EA Shrubs/Perennial and Ornamental Grasses 6 Acres Prairie Seeding 250 LF 8-inch HDPW Storm Sewer 4,300 LF 12-inch to 36-inch RCP Storm Sewer 13 EA Catch Basin 20 EA Storm Sewer Manholes 3 EA Pond Outlet Structures 30 EA 30-inch CMP Culvert 50 SF Signs Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bidders Proof of Responsibility must be submitted to SEH in accordance with the Instructions to Bidders. Contractors on the Project shall be required to comply with the minimum wages in effect for the State of Wisconsin. Download Teams | Join on the web Or call in (audio only) +1 872-242-7640,,671901454# United States, Chicago Phone Conference ID: 671 901 454# Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply. The City of River Falls reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City. The Work will be substantially completed on or before October 4, 2024 ; final completion- November 1, 2024. a. The Engineer's Opinion of Probable Cost is $15,000,000 |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |