Similar Projects
Removal and Replacement of Boiler, Oil Burner, Circulator Motor and Associated Piping and Insulation
Post-Bid
South Salem, NY 10590

Mechanical, Plumbing and Electrical Work for the Lower Wappinger Creek Community Boat House
Post-Bid
Wappingers Falls, NY 12590

Z--528-18-S112 Install Mixing Valves in Building 1 of Buffalo VAMC. Remove the Old Rubber Angle Stops and Add Ceramic Angle Stops as Well as Associated Connections.
Results
$250,000 to $500,000 est. value
Bullville, NY 14215

Boiler Maintenance for Housing Contract
Results
Watervliet, NY

BSA Bird Island Wastewater Treatment Plant Boiler Deaerator System Improvements
Post-Bid
Buffalo, NY 14202

Lansing Central School District - Reconstruction to Senior High School
Results
Lansing, NY

Gun Tube Heat Treat Furnace Replacement at the Watervliet Arsenal, NY
Post-Bid
$25,000,000 to $100,000,000 est. value
Watervliet, NY

Q--SPS RO Water System Service 528A7
Results
Syracuse, NY 13210

Granular Activated Carbon and Carbon Filter System Gravel Replacement - Project 4
Post-Bid
Niagara Falls, NY 14304

Annual Boiler/Burner Cleaning and Maintenance
Results
Pearl River, NY 10965

Walter Panas High School Boiler Reconstruction
Post-Bid
Cortlandt Manor, NY 10567

Building 17 Power Plant Equipment Maintenance, Testing and Repair for Centrifugal Chillers at West Averill Harriman State Office Campus
Term Contract
Results
Albany, NY 12226

Water Treatment Supply, Maintenance and Service on Mechanical Systems
Post-Bid
Poughkeepsie, NY 12601

Preventive Maintenance Service for the Building Management System and Ancillary Equipment
Term Contract
Results
Orangeburg, NY 10962

Replace Boiler
Post-Bid
Batavia, NY 14020

Last Updated 10/15/2020 08:28 AM
Project Title

Boiler Replacement

Physical Address View project details and contacts
City, State (County) Voorheesville, NY 12186   (Albany County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install (2) High efficiency, condensing, Lochinvar Boilers (or comparable units) to replace the existing Weil McLain unit. Scope to include; Lockout/tagout existing unit. Isolate gas supply, electrical power and control wiring. Disconnect existing main gas supply lines and electrical power wiring for modifications. Disconnect and remove existing chimney flue and patch chimney. Remove all piping headers, insulation, gas piping and electrical conduit to access boiler for removal. Disassemble, remove and dispose of existing boiler and burner assembly. Furnish and install (2) Lochinvar FTX, high efficiency, condensing boilers with a 500k input and 489k gross output, with a thermal efficiency of at least 97%. Furnish and install supply and return water piping with insulation, isolation valves, air separator and backflow preventer. Install temperature gauges. Furnish and install intake and exhaust pvc piping from side wall to each boiler. Extend electrical service to each boiler. Fill and check system for leaks. Program existing boiler controllers as required for efficient operation. Start and check boiler operation, provide training to Voorheesville Library Staff.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents