Similar Projects
Last Updated | 06/29/2020 03:57 AM |
Project Title | Wastewater Treatment Facility Capacity Expansion and Process Optimization |
Physical Address | View project details and contacts |
City, State (County) | Winter Garden, FL 34787 (Orange County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Providing engineering services related to improvements to the City’s Crest Avenue Wastewater Treatment Facility (WWTF) located at 101 E. Crest Avenue, which is currently rated at 4.75 MGD annual average daily flow (AADF). The City is requesting an evaluation of the existing WWTF process and innovative ways to increase the capacity to a minimum of 6 MGD using property currently owned by the City. The evaluation to increase capacity should include City owned properties located at 420 and 440 E. Smith Street which currently have 2 x 1.5 million gallon uncovered storage tanks. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |