Similar Projects
Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Cane Island Section Thirty Seven
Infrastructure
Bidding
$3,000,000 est. value
Hempstead, TX

Detention and Mitigation Basin/Lake Amenity, Channel Improvements and Storm Sewer to serve Glendale Lakes Section 11
Infrastructure
Bidding
$200,000 est. value
Houston, TX

Storm Water Management Services
Post-Bid
Corpus Christi, TX

Clearwater Creek Phase 1A Single-Family Residential Development - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
Marion, TX 78124

Unity Park Storm Drain Rehabilitation Project
Results
Highland Village, TX 75077

2020 Miscellaneous Neighborhood Drainage Improvements Phase II
Results
$588,489 est. value
Irving, TX

Construction of Water, Sanitary Sewer, and Storm Sewer for the Abbey at Veramendi
Infrastructure
Bidding
$420,000 est. value
New Braunfels, TX

Construction of Water, Storm Sewer, Sanitary Sewer, Sanitary Force Main and Paving for Valley Ranch Bend at White Oak Creek and Grand Parkway
Post-Bid
New Caney, TX

Ariza Easton Park - Public Storm Sewer Infrastructure
Results
Austin, TX 78744

Orchid Court - Storm Sewer Improvements
Infrastructure
Bidding
$500,000 est. value
Dalworthington Gardens, TX 76016

Vine Creek Subdivision Improvements - Phases 6 and 7
Renovation
Post-Bid
Pflugerville, TX 78660

260 Lake View Drainage Improvements
Results
$105,445 est. value
Celina, TX 75009

Bridgeland Prairieland Village Section 20 - Water, Non Potable Water, Drainage, Paving Improvements
Infrastructure
Bidding
$500,000 est. value
Houston, TX

Subterranean Storm Drainage System
Infrastructure
Post-Bid
Texarkana, TX

Elyson Exchange Way Street Dedication Section 1 Water, Sanitary Sewer, Storm Sewer Facilities, Reinforced Concrete Paving, and Asphalt Paving
Results
Houston, TX

Last Updated 05/31/2022 08:08 AM
Project Title

E-54 Sewer Main Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78259   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $33,239,392 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a civil project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.Estimate: $33,239,392.85 Sealed proposals are requested by the San Antonio Water System for the construction of the E-54 Sanitary Sewer Project, SAWS Job No. 21-4404. The work under this solicitation will include the installation of approximately 6 miles of 18-inch to 30-inch gravity sewer pipe and force mains in limestone rock via open-cut trenching, tunneling, and jack and bore installation methods. The project is located in the Edwards Aquifer Recharge Zone on the North side of San Antonio, near Bulverde Road between Loop 1604 and Evans Road. The construction scope of this project includes: 16,116 LF of 30-inch FRP gravity sewer main and tee-base manholes at depths up to 25 feet installed mostly via open-cut trenching and includes 230 LF of two-pass tunneling and 121 LF of jack and bore trenchless construction. 2,574 LF of 20-inch dual force mains (total 5,148 LF) installed mostly via open-cut and includes 1,001 LF of jack and bore trenchless construction. 7,301 LF of 24-inch, 21-inch, and 18-inch gravity sewer main and FRP manholes at depths up to 40 feet installed mostly via open-cut trenching and includes 1,964 LF of two-pass tunneling and 444 LF of jack and bore trenchless crossings. Pipe installation in limestone rock, Downstream tie-in to the SAWS E-4 project near Loop 1604 and upstream tie-ins near the existing SAWS Fossil Ridge, Fox Grove, and Fischer Tract lift stations. TCEQ SCS Plan compliance and a potential for Edward Aquifer sensitive feature mitigation. For questions regarding this solicitation, technical questions or additional information, please contact Roxanne Lockhart, Contract Administrator, in writing via email to: roxanne.lockhart@saws.org or by fax to 210-233-4438 until 10:00 AM (CDT) on June 2, 2022. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on June 9, 2022 as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashiers check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents