Similar Projects
Harmon Street Reconstruction And Water Main Replacement
Bidding
Less than $1,500,000 est. value
Saint Clair Shores, MI

Meter Maintenance
Post-Bid
Clinton Township, MI

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

2019 30 Mile Water Main Extension
Results
MI

Lipke Road Water Main Replacement
Results
Less than $277,973 est. value
Clinton Township, MI

Water Pipe and Fittings and Hydrants
Post-Bid
Mount Clemens, MI 48043

Donald Avenue Water Main Replacement Stephens to Toepfer
Results
Less than $1,400,000 est. value
Eastpointe, MI

Water Meter Replacement Program
Term Contract
Post-Bid
Sterling Heights, MI

Clinton River WM Replacement - Water Main Replacement Project - Clinton River Road
Results
Less than $730,128 est. value
Clinton Township, MI

2020 DWRF Project –14 Mile Road Water Main and PRV’SDWRF Project No. 7425-01Andutica Road Water Main –13 Mile Road to 14 Mile Road
Results
Less than $6,200,000 est. value
Fraser, MI

DWRF Water Main Replacement and PRV Installation
Results
Fraser, MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Gate Valves
Results
Mount Clemens, MI

Beste Reconstruction and Water Main Replacement
Results
Saint Clair Shores, MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 01/18/2021 10:39 PM
Project Title

Remick Drive Water Main Replacement

Physical Address View project details and contacts
City, State (County) Clinton Township, MI 48036   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water main replacement in an existing residential or commercially developed area. Horizontal Directional Drilling for water main or low pressure sewers. The approximate primary quantities involved in this work are as follows: Water Main, Abandon, 6 inch 4,823 Ft Water Main, Abandon, 8 inch 1,196 Ft Water Main, PVC (C-900 DR 14), 8 inch, Tr Det F 2,621 Ft Water Main, PVC (C-900 DR 14), 8 inch, Tr Det G 1,419 Ft Water Main, Fusible PVC (C-900 DR 14), 8 inch, Directional Drilled 2,055 Ft Fire Hydrant Assembly 13 Ea Water Main Connection, 6 inch 5 Ea Water Main Connection, 8 inch 3 Ea Gate Valve and Well, 8 inch 14 Ea Water Serv, Transfer 40 Ea Water Serv 42 Ea Water Serv, Long 11 Ea Driveway, HMA, 4 inch 500 Syd Driveway, Nonreinf Conc, 6 inch 500 Syd Driveway, Nonreinf Conc, 8 inch 175 Syd This primary work shall be included together with related work as well as restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents