Similar Projects
Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells
Alteration
Design
Alton, IL 62002

James Street Pump Station and General HVAC, Structural, Electrical, and Mechanical Improvements
Infrastructure, Alteration
Bidding
Joliet, IL

Proposed Water System Improvements 2019
Infrastructure
Bidding
Herrick, IL

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Chippewa Campground 2020 Water System Improvements
Results
Less than $350,000 est. value
Bourbonnais, IL 60914

Well No. 7 Raw Water Line Replacement
Infrastructure
Bidding
Milford, IL 60953

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Central WWTP Raw Sewage Pump Replacement
Results
Morris, IL 60450

Public Water Supply - Water Well #10
Infrastructure
Bidding
Newton, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Water Well No. 2 Rehabilitation
Results
Less than $2,158,600 est. value
Elk Grove Village, IL 60007

Pump Preventative Maintenance and As-Needed Repairs
Term Contract
Bidding
Glenview, IL

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Last Updated 02/04/2022 01:49 PM
Project Title

Well #16 Maintenance and Repair

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60014   (McHenry County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The last maintenance on this well and pumping equipment was completed in spring of 2020. The City is not having issues with the pumping equipment or well at this time, so scheduled work on this well can be mutually coordinated to be completed between the fall of 2022 to the spring of 2023. If this well fails prior to the fall of 2022, the contractor must schedule and begin work without delay. This project includes a new a new pump and motor to be purchased and installed. The City may have the existing pump and motor rebuilt to keep as spare equipment. The new pump and motor must be ordered immediately after contract award. Proof of order shall be submitted to City. Contractor shall have the new pump and motor available for installation if there is a failure prior to the fall of 2022. This well motor is powered by a VFD with a by-pass starter, so the new equipment and materials installed must be inverter duty rated.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents