Similar Projects
208 Sycamore Creek Storm Drain Repair
Infrastructure
Bidding
Holly Springs, NC

Raleigh Green Stormwater Infrastructure Retrofits
Post-Bid
Less than $600,000 est. value
Raleigh, NC 27602

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Streambank Repairs
Results
Raleigh, NC 27604

Stormwater Drainage Assistance Program
Results
Less than $120,888 est. value
Raleigh, NC 27602

Five County Stadium Approach and Entry + Restroom Renovations
Renovation
Construction
Less than $1,529,432 est. value
Zebulon, NC 27597

Wake Forest High School Stadium Renovation
Renovation
Construction
$6,647,000 est. value
Wake Forest, NC 27587

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

Stream Bank Repairs
Results
Raleigh, NC 27601

Streambank Repairs (Formal)
Post-Bid
Raleigh, NC

Corrugated Metal Pipe for Stone Creek/Bear Garden Project
Results
Raleigh, NC 27699

Stormwater Drainage Assistance Program - 904 Wakestone Court
Post-Bid
Raleigh, NC

Culvert Maintenance
Results
Apex, NC

Sierra Drive Drainage Improvements
Post-Bid
Raleigh, NC 27603

Falls Lake Bulkhead Repairs
Results
$100,000 to $250,000 est. value
Wake Forest, NC 27587

Reported 12/14/2021 12:00 AM
Project Title

Ting Stadium Structure and Drainage Repair

Physical Address View project details and contacts
City, State (County) Holly Springs, NC 27540   (Wake County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Stadium
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide concrete and drainage repair services at Ting Park Stadium. The purpose of the project is to install the recommended repairs as detailed in the Technical Memorandum to prevent the existing conditions from potentially becoming future structural issues and to reduce the areas of leakage. The scope of services is separated into three areas; the concourse, stadium seating and the club house. This work includes but is not limited to: 1. Removal of pavement coating. Repair slab cracks. Install repair products. 2. Repair the joints between walls and stairs and install waterproofing products. 3. Removal of existing expansion joint material. Install new expansion joint material and caulk/seal the joint. 4. Repair leaks. 5. Painting. Concrete repair work to conform as applicable to ACI 306 for cold weather concrete pours and curing. Repairs must be consistent and compatible with Town of Holly Springs standards and regulations. Interested firms must have demonstrated experience in concrete and drainage repair.

Details

Stadium, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents