Similar Projects
SR 788 Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$520,000 CJ est. value
Wellston, OH 45692

Roadway Minor Rehab - US 35
Infrastructure
Design
$4,641,076 CJ est. value
Jackson, OH 45640

Paving Roads
Infrastructure
Bidding
$300,000 CJ est. value
Jackson, OH 45640

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Micro Surface Sealing
Infrastructure
Post-Bid
$300,000 CJ est. value
Bloomfield Township, OH 45640

Infrastructure Improvements 2021 New York / Broadway - Waterline
Infrastructure
Results
$748,545 est. value
Wellston, OH

Advanced Metering Infrastructure
Infrastructure
Results
Jackson, OH

Bellisio Foods / Jackson
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Jackson, OH 45640

SR 134 - Culvert Replacement
Infrastructure
Post-Bid
$641,000 CJ est. value
Lynchburg, OH 45142

JAC-CR15 (Camba Road)-1.91 at Grade Railroad Crossing Project
Infrastructure
Results
$298,918 CJ est. value
Bloomfield Township, OH 45640

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

2021 CDBG Program Oak Hill Water Project
Infrastructure
Results
$322,175 CJ est. value
Oak Hill, OH 45656

Lookout Drive Paving Project
Infrastructure
Post-Bid
$100,000 CJ est. value
Wellston, OH 45692

Fairgreens Road Slip Repair
Infrastructure
Post-Bid
$400,000 CJ est. value
Jackson, OH 45640

Taco Bell / Jackson
New Construction, Infrastructure - 1,485 SF
Post-Bid
$500,000 CJ est. value
Jackson, OH 45640

Last Updated 03/30/2023 10:27 AM
Project Title

Infrastructure Improvements - Storm and Sanitary Sewers

Physical Address View project details and contacts
City, State (County) Wellston, OH 45692   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For Infrastructure Improvements - Storm and Sanitary Sewers The Project work shall consist of furnishing all labor, materials, and equipment in accordance with the contract documents. Project cost estimate is $4,500,000.00 Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required by Section 153.54 of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certified Check or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. Federal Prevailing Wage Rates and Equal Employment Opportunity requirements are applicable to this project. The Owner reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best interest of the Owner. Failure to submit the Bid Guaranty Bond and the required notarized affidavits with the bid shall be cause for considering the bid submission incomplete and for the rejection of the bid. Each bid must contain the full name of the party or parties submitting the bid and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123.2, the Governors Executive Order of 1/27/72, and Governor's Executive Order 84-9 shall be required. This project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity ("EDGE") Business Development Program. A Bidder is required to submit with its Bid and with its Bidder's Qualifications form, certain information about the certified EDGE Business Enterprise(s) participating on the Project with the Bidder. Refer to Section 24 of the Instructions to Bidders. The EDGE Participation Goal for the Project is 5.0 percent. The proposed work is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968 and the implementing regulations at 24 CFR part 75. The criteria for determining eligibility as a Section 3 business concern can be found in 24 CFR 75.5 and the selected Contractor's Section 3 obligations, as described at 24 CFR 75.19. DOMESTIC STEEL USE REQUIREMENTS AS SPECIFIED IN SECTION 153.011 OF THE REVISED CODE APPLY TO THIS PROJECT. COPIES OF SECTION 153.011 OF THE REVISED CODE CAN BE OBTAINED FROM ANY OF THE OFFICES OF THE DEPARTMENT OF ADMINISTRATIVE SERVICES. Material must comply with the American Iron & Steel (AIS) Requirement of the Consolidated Appropriations Act of 2014 (Public Law 113-76). The EDGE Participation Goal for the Project is 5.0 percent, 1.3% of all contracts to MBEs and 1.0% of all contracts to WBEs. Substantial Completion date for the contract shall be 240 days from date ofNotice to Proceed. Final Completion date for the contract shall be 270 days from date ofNotice to Proceed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents