Similar Projects
Heritage Place Mixed Use
New Construction
Design
Naperville, IL 60540

Riverfront Master Plan
New Construction
Design
Plainfield, IL 60544

Buffalo Grove Parks 2021 Improvements
Renovation
Bidding
Buffalo Grove, IL 60089

Basketball Court Replacement within Emricson Park
Bidding
Woodstock, IL 60098

Sandblasting, Crack Repair and Painting
Post-Bid
Niles, IL 60714

Chestnut Avenue Improvements
Post-Bid
Glenview, IL 60026

DuPage Highlands Park Development
Results
Winfield, IL 60190

Dorothy Drennon Park
Renovation
Results
Oakbrook Terrace, IL 60181

Robin`s Nest Learning Center Park
New Construction
Construction
Marion, IL 62959

The Oak Brook Commons Mixed Use
New Construction
Construction
$500,000,000 est. value
Oak Brook, IL 60523

Ballard Farm Single Family Homes
New Construction
Design
Plainfield, IL 60544

Cardinal Drive Park Inclusive Playground
Bidding
Rolling Meadows, IL

Reforestation at Elburn Forest Preserve
Post-Bid
Elburn, IL 60119

Synthetic Turf Maintenance & Repair
Renovation
Results
$42,700 est. value
Rockford, IL 61104

The Currents of Kankakee Riverwalk
New Construction - 56,628 SF
Design
$2,500,000 to $3,500,000 est. value
Kankakee, IL 60901

Last Updated 03/04/2021 05:55 PM
Project Title

Blair Park OSLAD Development

Physical Address View project details and contacts
City, State (County) Urbana, IL 61801   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally includes Concrete path with ADA access, New Playground and Fitness Course, Installation of Basketball court and Sutu Wall. Project Description: The project for which Bids are being accepted consists of improvements, and two alternates: 1. OSLAD Improvements: a. Demolition and removal and delivery of the existing playground equipment, playground curbing to the Owner, and demolition, removal and disposal of the existing concrete paths; playground path, horseshoe pits, and shelter sidewalk; b. Construction of new concrete sidewalk, construction of playground area, fitness area and associated excavation, sidewalk, curbing, and drainage system (playground equipment and fitness equipment will be purchased and installed by the Owner); and c. Construction of a horseshoe pits, picnic table, benches, associated concrete path and drainage system. d. Renovation of t-ball backstop concrete paving 2. Alternates: a. Alternate 1: Expand east path to 8’ wide concrete b. Alternate 2: Expand south path to 8’ wide concrete

Details

Park/Playground, New Construction.
Division 03 - Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Furniture.
Division 26 - Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Conduit for Electrical Systems.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents