Similar Projects
New Booster Pump Station for SF/150 - Catawba County
New Construction
Conception
$1,600,000 est. value
Newton, NC

Sherrills Ford Road 1.0 MG Storage Tank
Infrastructure
Conception
$3,000,000 est. value
Sherrills Ford, NC 28673

111 Main Apartment Building
New Construction, Infrastructure - 5,000 SF
Design
$41,000,000 CJ est. value
Hickory, NC 28658

East 5th Street Public Works Facility Stormwater Pipe Replacement
Infrastructure
Bidding
$220,000 CJ est. value
Newton, NC 28658

Newton Downtown Streetscape Improvements Phases 3 & 4
Infrastructure
Bidding
$500,000 CJ est. value
Newton, NC 28658

BellaAge Senior Living
New Construction, Infrastructure - 181,000 SF
Sub-Bidding
$50,000,000 CJ est. value
Hickory, NC 28602

RFQ Design - Education Center Engineering and Design
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Hickory, NC 28658

Trivium East Roadway Improvements - City of Hickory
Infrastructure
Post-Bid
$3,213,000 CJ est. value
Hickory, NC 28658

Lyle Creek and Pump Station Project - Division I
New Construction
Results
$2,266,000 est. value
Hickory, NC 28602

Road Improvement Project
Infrastructure
Results
$69,489 CJ est. value
Newton, NC 28658

Maiden Elementary School for Catawba County Schools
Demolition, New Construction, Infrastructure - 95,007 SF
Construction
$29,000,000 CJ est. value
Maiden, NC 28650

Additions and Renovations at Newton Conover High School
Addition, Renovation, Infrastructure
Pending Verification
$20,800,000 CJ est. value
Newton, NC 28658

Additions and Renovations at Newton Conover High School
Addition, Renovation, Infrastructure
Pending Verification
$20,800,000 CJ est. value
Newton, NC 28658

Public Works Addition - City of Conover
Addition, Infrastructure
Bidding
$1,500,000 CJ est. value
Conover, NC 28613

Punch Loop Road Relocation
Infrastructure
Post-Bid
$2,000,000 est. value
Conover, NC 28613

Last Updated 01/03/2023 10:11 AM
Project Title

Snow Creek Pump Station Relocation and Flood Hardening - City of Hickory

Physical Address View project details and contacts
City, State (County) Hickory, NC 28658   (Catawba County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 3, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Notice is hereby given that the City of Hickory is conducting a qualification-based selection process to retain a proponent for professional engineering services for Snow Creek Pump Station Relocation and Flood Hardening Project. SCOPE OF SERVICES The City of Hickory Public Utilities Department is soliciting RFQ's for the design, permitting, bidding, FEMA BRIC grant program management and other related engineering services common to infrastructure hardening and flood mitigation. This project generally consists of the relocation of the Snow Creek Pump Station outside of the Special Flood Hazard Area, and stream restoration through implementation of floodplain benching at Snow Creek. Written questions regarding this RFQ must be received by Friday, March 25th 2022, no later than 12:00 PM. Email questions are acceptable but must contain the wording "Snow Creek Pump Station Relocation and Flood Hardening Project" in the subject line. Questions may then be responded to as an amendment to this document and posted to the solicitation within an anticipated five (5) working days after questions deadline. Oral statements or instructions shall not constitute an amendment to this RFQ. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents