Similar Projects
Last Updated | 09/09/2023 06:36 AM |
Project Title | Addition of 1,000 In-Ground Burial Crypts and Other Improvements Northeast Louisiana Veterans Cemetery |
Physical Address | View project details and contacts |
City, State (County) | Rayville, LA 71269 (Richland County) |
Category(s) | Heavy and Highway, Religious/Funeral, Sewer and Water |
Sub-Category(s) | Funeral Facility, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,093,950 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Job No: 23S010.00 All bids have rejected. ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY FACILITY PLANNING AND CONTROL OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS BEFORE THE BID OPENING. Placement of 867 In-ground pre-placed crypts and associated section and control markers, crypt field grading, planting, and irrigation. Additional improvements include the replacement of the flower water station, the replacement of cremains field section markers, and pavement repairs in the general location of the Administration Building, along with signage and service seals at the Committal Shelter. All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions andm requirements of this Section; and those stated in the bidding documents shall not be waived by any entity. When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |