Similar Projects
Wastewater Treatment Plant - Town of Wakefield
New Construction, Infrastructure
Conception
$1,120,000 CJ est. value
Wakefield, NH 03872

Community Center Building - Town of Wakefield
Demolition, New Construction, Infrastructure
Conception
$4,900,000 CJ est. value
Wakefield, NH 03872

Forest and Sewall Rd Pressure Sewer Extension
Infrastructure
Bidding
$590,000 CJ est. value
Wolfeboro, NH 03894

Forest and Sewall Rd Pressure Sewer Extension
Infrastructure
Bidding
$590,000 CJ est. value
Wolfeboro, NH 03894

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ - ProvinceLake Drainage Improvements Analysis for Bailey Road
Term Contract
Post-Bid
Effingham, NH 03882

Sidewalk Reconstruction
Infrastructure
Results
$100,378 CJ est. value
Wolfeboro, NH 03894

Little Chatham Road Reconstruction
Infrastructure
Results
$295,995 CJ est. value
Center Conway, NH 03813

Mount Washington Cog Railway - Restaurant & Hotel
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Jackson, NH 03846

White Mountain Highway / Multi-Use
Demolition, New Construction, Infrastructure - 20,715 SF
Pending Verification
$27,600,000 CJ est. value
North Conway, NH 03860

Cleared and Leveled With Gravel Then Topped With Stonedust
Infrastructure
Post-Bid
$40,000 CJ est. value
Wakefield, NH 03872

FY2024 Road Program Roadway Rehabilitation, Reconstruction, and Paving
Infrastructure
Results
$950,844 CJ est. value
Moultonborough, NH 03254

Cambria Hotel / North Conway
Demolition, New Construction, Infrastructure - 20,715 SF
Pending Verification
$28,700,000 CJ est. value
North Conway, NH 03860

Statewide Tier 2 Resurfacing (NW)
Infrastructure
Post-Bid
$4,897,125 CJ est. value
Tamworth, NH 03814

Sanbornville Water Precinct Project
Infrastructure
Results
$696,200 CJ est. value
Wakefield, NH 03872

Last Updated 06/20/2023 02:11 PM
Project Title

Piping and Meter Replacement

Physical Address View project details and contacts
City, State (County) Ossipee, NH 03864   (Carroll County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Piping replacement inside the meter/chlorination building shall be sequenced so as to maximize continued operation and minimize shutdown of the system. Piping work requiring a shutdown shall be conducted once storage tank is at a suitable water level for a temporary shutdown. Contractor shall confirm water level with the Owner before initiating a temporary shutdown. In general, replacement of meter building piping and metering consists of the following: 1. Mobilization, demobilization & general conditions. 2. Limited temporary shutdown of the wells. 3. Disconnect plastic tubing from existing chlorine injection tap, temporarily seal, and reconnect to new chlorine injection tap. 4. Demolition of existing plumbing between inlet and outlet flanges. 5. Include in installation of each of the three (3) well supply lines from upstream to downstream in the following order: a. 4-inch CI 52 DI with 2-inch threads b. 2-inch copper threaded x soldered nipple c. 2-inch x 1.5-inch tee with brass ball valve and stainless quick connect fitting d. 2-inch copper 90 elbow c. 2-inch brass isolation ball valve #1 f. Smooth end sample tap with valve g. 1-inch PD Meter h. Conduit & wire from Meter 4-20 mA signal to SCADA/PLC panel i. 2-inch brass isolation ball valve #2 j . 2-inch brass check valve k. 2-inch copper tee 6. Include in installation of the discharge header from upstream to downstream in the following order in general, is: a. Chlorine injection tap #1 (connect to existing plastic tubing) b. Chlorine injection tap #2 (capped) c. PD Meter d. Conduit & wire for meter 4-20 mA signal to SCADA/PLC panel e. Smooth end sample tap with valve f. 2-inch x 1.5-inch tee with brass ball valve and stainless quick connect fitting g. 2-inch copper 90 elbow h. 2-inch copper threaded x soldered nipple i. 4-inch CI 52 DI with 2-inch threads 7. Remove loose paint and rust on 4-inch F L DI pipes through the floor and chip out any loose concrete. Properly prepare the substrate and apply a zinc rich primer and epoxy paint to the existing pipes and flanges that will remain. 8. Pressure testing, disinfection and bacterial testing All bids will remain subject to acceptance for 30 days after the day of the Bid Opening, but the Owner may, in its sole discretion, release any bid prior to that date. Minimum insurance requirements for this project shall be as required by Section 7 of the General Conditions. Carroll County, Underwood Engineers and Emery & Garrett Groundwater Inc (EGG1), a subsidiary of GZA shall be named as additional insured. The OWNER may waive any informalities or minor defects or reject any and all BIDS. The Owner reserves the right to award these singly or in any combination. The Owner reserves the right to reject any or all bids, to accept any bid, to waive any informality on bids received and to make decisions that are in the best interest of the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents