Similar Projects
RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Cloverdale Road, Victory Road / Overland Road - Ada County Highway District
Infrastructure
Conception
$1,250,000 CJ est. value
Boise, ID 83709

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Peak at Sawtooth Village
New Construction, Infrastructure - 4,846 SF
Design
$1,400,000 CJ est. value
Meridian, ID 83646

Star Road Bridge #1093
Demolition, New Construction, Infrastructure
Bidding
$294,000 CJ est. value
Star, ID 83669

Star Road Bridge #2040
Demolition, New Construction, Infrastructure
Bidding
$74,000 CJ est. value
Star, ID 83669

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Post-Bid
$4,181,379 CJ est. value
Boise, ID 83706

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Bull Meadow Sage-Grouse Habitat Improvement
Infrastructure
Results
$400,000 est. value
Boise, ID

Spring Valley Water Storage Reservoirs No.1 and No.2
New Construction, Infrastructure
Results
$7,453,921 CJ est. value
Meridian, ID 83642

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Ann Morrison Park Drive / Multi Residential
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Boise, ID 83706

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Lake Hazel Rd, Eagle Road / Cloverdale Road - Ada County Highway District
Infrastructure
Conception
$425,000 CJ est. value
Meridian, ID 83642

Last Updated 09/27/2023 11:19 AM
Project Title

New Fabrication Plant - Micron Technology Inc

Physical Address View project details and contacts
City, State (County) Boise, ID 83716   (Ada County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $15,000,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Memory Chip Fabrication Plant. Ceremonial Groundbreaking was held September 2022. As of September 27, 2023, the project is in planning. The project has received planning and entitlement approval from the City of Bosie. No other final plans or building permits have been submitted. Information regarding the architect and general contractor has not been disclosed. Although some grading and site clearing has begun, a firm timeline for vertical construction has not been set. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents