Similar Projects
Kiel - New Holstein Const / Rsrf10 / R / W-no
Infrastructure
Design
$3,000,000 CJ est. value
Chilton, WI 53014

Kiel - New Holstein Const / Rsrf10 / R / W-no
Infrastructure
Design
$3,000,000 CJ est. value
Chilton, WI 53014

A New Fire Station
New Construction, Infrastructure
Bidding
$1,200,000 CJ est. value
Chilton, WI 53014

Chilton New Stadium and Elementary School Addition and Renovations
Addition, Demolition, New Construction, Build-out, Infrastructure - 45,414 SF
Sub-Bidding
$4,000,000 CJ est. value
Chilton, WI 53014

Asphalt a Boat Harbor Parking Lot
Infrastructure
Post-Bid
Brothertown, WI

2022 Irish Road / Geiser Way / T.I.D. 6 Construction
Infrastructure
Post-Bid
$1,375,000 est. value
Chilton, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street Paving Program
Results
WI 54915

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

Wedging and Sealing
Infrastructure
Post-Bid
$240,000 est. value
Potter, WI

Chilton Court Street and Madison Street/Breed Street Concrete Pavement
Results
Chilton, WI 53014

Asphalt Bridge Approaches - Appleton, Sth 441
Infrastructure
Pending Verification
$7,000,000 CJ est. value
Hilbert, WI 54129

Last Updated 11/16/2022 09:08 AM
Project Title

2020 Street Urbanization

Physical Address View project details and contacts
City, State (County) Hilbert, WI 54129   (Calumet County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2020 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,807,504 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

On Tuesday, May 12, 2020, the Village of Harrison Board met and discussed the 2020 Street Urbanization Project. The Board decided unanimously to reject all bids for the project. For 2020 Street Urbanization The work shall consist of the urbanization of Golden Way, Cameo Court, Coral Court, and Pearl Drive in the Village of Harrison, Wisconsin. The Base Bid Contract work includes 3,300 linear feet of storm sewer main, 1,600 linear feet of storm sewer laterals, 8,500 cubic yards of roadway excavation, 12,500 tons of aggregate base, 6,100 linear feet of concrete curb and gutter, 2,700 tons of HMA pavement, 22,000 square feet of concrete driveway aprons, and 13,000 square yards of lawn restoration. There is an Alternate Bid to urbanize the roadways with concrete pavement rather than HMA pavement. The Alternate Bid Contract work includes 3,300 linear feet of storm sewer main, 1,600 linear feet of storm sewer laterals, 9,900 cubic yards of roadway excavation, 13,400 tons of aggregate base, 13,000 square yards of 7-inch non-reinforced concrete pavement, 22,000 square feet of concrete driveway aprons, and 13,000 square yards of lawn restoration. In addition, there is a Supplemental Bid that includes 700 linear feet of 24-inch storm sewer and 1,600 square yards of lawn restoration. The Project Documents are on file for inspection at the offices of McMahon Associates, Inc., 1445 McMahon Drive, Neenah, Wisconsin 54956. No Bid shall be received unless accompanied by a Certified Check or satisfactory Bid Bond payable to the Village of Harrison in an amount not less than 5% of the maximum Bid as a guarantee that, if the Bid is accepted, the Bidder will execute and file the Contract, Performance/Payment Bonds and Insurance Certification, as required by the Contract Documents, within 15-days after the Notice of Award. The OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the Village of Harrison. No Bid shall be withdrawn for a period of 60-days after the scheduled opening without the consent of the OWNER. The Contract letting shall be subject to the provisions of Sections 66.0901, 66.0903 and 779.14 of the Wisconsin Statutes. The tentative Contract award date is Tuesday, May 26, 2020 BID A. - ASPHALT PTS CONTRACTORS, INC $1,250,587 BID B. - CONCRETE SOPER GRADING & EXCAVATING, LLC $1,556,917

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents