Similar Projects
Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Conception
$4,000,000 CJ est. value
Cadott, WI 54727

WIS 178, Olson Drive Intersection - Wisconsin Department of Transportation
Infrastructure
Conception
$1,400,000 CJ est. value
Chippewa Falls, WI 54729

Hope Village
New Construction, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Chippewa Falls, WI 54729

Hope Village
New Construction, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Chippewa Falls, WI 54729

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

New Home Construction
New Construction
Post-Bid
Stanley, WI 54768

Well No. 5 Pump House and Site Improvements
Infrastructure
Results
Lake Hallie, WI

Crack Filling
Infrastructure
Results
$4,566 CJ est. value
Woodmohr, WI 54724

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Parking Lot Repaving
Infrastructure
Construction
$219,500 CJ est. value
Chippewa Falls, WI 54729

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

RFP Engineering - Elk Mound - Bloomer
Infrastructure
Pending Verification
$8,000,000 CJ est. value
Jim Falls, WI 54748

NWC Security System Upgrade - State of Wisconsin - Department of Health Services
Infrastructure
Design
$560,000 CJ est. value
Chippewa Falls, WI 54729

Road Project
Infrastructure
Post-Bid
$154,000 CJ est. value
New Auburn, WI 54757

8th Street Resurfacing
Infrastructure
Results
$86,260 CJ est. value
Cornell, WI 54732

Last Updated 03/24/2023 03:08 PM
Project Title

Willow Creek Parcel 6 - Park West Townhomes

Physical Address View project details and contacts
City, State (County) Chippewa Falls, WI 54729   (Chippewa County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2021
Bids Due View project details and contacts
Estimated Value $85,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 10 eight-plexes, 10, twelve-plexes, and 30 single-family homes. As of February 17, 2021, this project has obtained conditional approval of a Planned Development Conditional Use Permit and is pending plat approval and an access agreement with the county due to one of the access points being a county road. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2021. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction. New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents