Similar Projects
Roadway Minor Rehab - US 20
Infrastructure
Design
$8,139,050 CJ est. value
Norwalk, OH 44857

Roadway Minor Rehab - US 20
Infrastructure
Design
$8,139,050 CJ est. value
Norwalk, OH 44857

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

2023 Paving and Sidewalk Replacement New London K-12
Infrastructure
Bidding
$1,145,139 CJ est. value
New London, OH 44851

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Purchase and Development of Old School Property
Infrastructure
Results
New London, OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

SR 13 - Roadway Minor Rehabilitation
Infrastructure
Design
$13,644,000 CJ est. value
Norwalk, OH 44857

West Main Street Phase I
Infrastructure
Bidding
$800,000 CJ est. value
Norwalk, OH 44857

Gore Orphanage Road Bridge #1535 Replacement & Slip Repair
Infrastructure
Post-Bid
$4,184,000 CJ est. value
Wakeman, OH 44889

New State Road Resurfacing - Phase 6
Infrastructure
Results
$600,000 est. value
Norwalk, OH 44857

Roadway Minor Rehab - US 250
Infrastructure
Design
$2,848,400 CJ est. value
Norwalk, OH 44857

Dollar General #23546 / Willard
New Construction, Infrastructure - 12,480 SF
Bidding
$2,900,000 CJ est. value
Willard, OH 44890

Dollar General #24658 / Bellevue
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Bellevue, OH 44811

Last Updated 03/16/2023 04:36 AM
Project Title

Bridge Preservation - SR 162

Physical Address View project details and contacts
City, State (County) Willard, OH 44890   (Huron County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2027
Bids Due View project details and contacts
Estimated Value $878,987 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge ReplacementHUR-SR-0162-02.70. As of March 16, 2023, the project is in Design status. Anticipated letting date is January 01, 2027. OHDOT - Bridge Preservation - SR 162 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents