Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Replace Existing Wastewater Lift Station 3
Renovation
Design
$200,000 est. value
Lacey, WA 98503

Main Industrial Pump Station Rehabilitation
Renovation
Bidding
$400,000 est. value
Vancouver, WA

WWTP Drain Lift Station Replacement
Infrastructure
Bidding
$265,000 est. value
Granite Falls, WA

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Post-Bid
Mercer Island, WA 98040

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Northshore Lift Station
New Construction
Bidding
$1,000,000 to $1,700,000 est. value
Moses Lake, WA

Biosolids Dewatering and Lift Station Improvement
Renovation
Post-Bid
Twisp, WA

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

Bonney Lake 950 Zone Tank and 950 / 1010 Zone Pump Station
New Construction, Infrastructure
Bidding
$8,900,000 est. value
Tacoma, WA

Emerson Avenue Wastewater Pump Station
New Construction
Post-Bid
Hoquiam, WA 98550

Thomas Lake Lift Station Replacement
Renovation
Results
$2,187,000 est. value
Mill Creek, WA 98012

Water Reclamation Facility Phase 2 Upgrades Project
Renovation, Infrastructure
Bidding
$400,000 est. value
Yelm, WA 98597

Last Updated 07/11/2022 07:37 AM
Project Title

Fry Creek Pump Station

Physical Address View project details and contacts
City, State (County) Hoquiam, WA 98550   (Grays Harbor County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new Stormwater Pump Station for Fry Creek to replace the existing pump station located adjacent to Port Industrial Road in Aberdeen, WA. The work includes but is not limited to installing a new pump station building with vertical turbine pumps and electrical controls, new tide gate structure, onsite generator, bearing piles and sheet pile installation, along with mechanical, electrical, and civil work.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents