Similar Projects
Tom Corley Place/Townhome Subdivision
New Construction, Infrastructure
Conception
$12,825,000 CJ est. value
Lexington, SC 29072

US 378 Over Twelve Mile Creek
Demolition, New Construction, Infrastructure
Conception
$11,785,000 CJ est. value
Lexington, SC 29072

Batesburg-Leesville Boarding Facility
New Construction, Infrastructure - 4,000 SF
Design
$600,000 CJ est. value
Leesville, SC 29070

Batesburg-Leesville Boarding Facility
New Construction, Infrastructure - 4,000 SF
Design
$600,000 CJ est. value
Leesville, SC 29070

Fuel Canopy Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Lexington, SC 29072

Twelve/Fourteen Mile Creek 30'' Force Main - Division I (Cromer Road Pump Station to I-20 Lagoon Pump Station)
Infrastructure
Bidding
$3,600,000 CJ est. value
Lexington, SC 29072

Irmo High School East Wing Replacement - District 5 of Lexington and Richland Counties
New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Columbia, SC 29212

On-Call Sidewalk, Curb and Gutter, Ada
Infrastructure
Post-Bid

District 4 On-Call Driveway Repair
Infrastructure
Results
Columbia, SC

Enhancement - SC 23
Infrastructure
Results
SC

Murphy Express #8643 / Springdale
Demolition, New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Cayce, SC 29033

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Cardiac Catheterization Lab - Lexington Medical Center
Addition, Demolition, Infrastructure
Pending Verification
$2,902,219 CJ est. value
West Columbia, SC 29169

US 21 over Congaree Creek
Demolition, New Construction, Infrastructure
Conception
$6,750,000 CJ est. value
Cayce, SC 29033

Lexington County Boardwalk
Infrastructure
Design
Leesville, SC 29070

Last Updated 04/18/2023 06:34 AM
Project Title

Fort Jackson Organizational Vehicle Parking

Physical Address View project details and contacts
City, State (County) Gaston, SC 29053   (Lexington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is subject to the Availability of Funds. Construction Services for the Design-Bid-Build project for FY23 NEFF Organizational Vehicle Parking in Ft. Jackson, South Carolina Estimated Construction Cost Range is betw een $5,000,000 and $10,000,000. NAICS Code 238910 Size Determination $19 Million BID MODIFICATIONS RECEIVED BY FASCIMILE WILL NOT BE CONSIDERED. This project is 100% set-aside for Service Disabled Veteran Owned Small Business. Funds are not presently available for this acquisition. No contract aw ard will be made until appropriated funds are made available. Central Contractor Registration and ORCA are now available through the System for Aw ard Management (SAM), available at www.sam.gov. Offerors must comply w ith the requirements of 52.204-7 and any other CCR/ORCA requirements in this solicitation through SAM. PLEASE NOTE: SAM is completely free of charge for both registrants and users. Technical Inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: http://projnet.org/projnet. Please see Section 002100, Bidder Inquiry for further instructions. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on "View FFP Contract Changes Playbook Here". *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents