Similar Projects
Sunland Park Levee Rehabilitation
Term Contract
Design
El Paso, TX

Lucero Center Pool Drainage System
Infrastructure
Bidding
Espanola, NM

Construction of the Country Club Drive - St. Andrews Way Infrastructure and Roadway Improvements
Infrastructure
Bidding
Angel Fire, NM 87710

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

Phase I of the Miami Lake Restoration Project
Post-Bid
Truth or Consequences, NM 87901

Drainage and Roadway Improvements Ridge Road - Phase 1
Results
Silver City, NM 88061

Upper Bosque De Bernalillo Flood Mitigation Project
Results
$489,300 est. value
Albuquerque, NM 87124

NM 124 Road Diet
Infrastructure
Bidding
$1,350,000 est. value
Laguna, NM

Jemez River Flume Reconstruction Project
Post-Bid
Zia Pueblo, NM 87053

2018 Colonias Roadway & Drainage Improvements Foster Drive NMFA Colonias Stantec Project
Results
$542,820 est. value
Reserve, NM 87830

West Side Pond Reconstruction
Infrastructure
Bidding
Belen, NM 87002

Turley-Manzanares Acequia Rehabilitation Project Phase 2
Post-Bid
NM

2019 CDBG - Street, Drainage Improvements
Results
$802,963 est. value
Jal, NM 88252

Ridge Road Phase 2 - Drainage and Roadway Improvements 2020
Infrastructure
Bidding
$900,000 to $950,000 est. value
Silver City, NM 88061

Area-Wide Flood Control Rehabilitation X Project
Post-Bid
$1,500,000 est. value
Albuquerque, NM

Reported 02/24/2022 12:00 AM
Project Title

Farmers Mutual Ditch Association Reach 1, San Juan County, New Mexico

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Government is seeking qualified, experienced sources capable of constructing approximately 4,500 feet of buried pipeline having an inner diameter of 72-inches (6-feet). The buried pipeline will be constructed within the alignment of an existing irrigation ditch which is carved in a large sandstone formation. The buried pipeline will be non-pressurized and will carry irrigation flows alongside a steep rock cliff which itself has a history of intermittent rock fall events. The slopes are extremely steep and due to their geological composition pose a potential rockfall hazard to construction workers working below. Prior to construction of the buried pipeline, light rock scaling shall be performed by experienced rock scaling professionals on the cliff faces to dislodge any loose rock. Subsequently the cliff faces shall be certified by a licensed professional geologist with rock scaling experience as safe before construction of the pipeline can begin. Currently it is anticipated that all rock scaling for this project can successfully be performed without the use of powered pneumatic or hydraulic tools or blasting. Once installed, the buried pipeline will serve as a new maintenance access road and will therefore be required to carry an AASHTO HS-20 traffic loading.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, TV Inspection of Sewer Pipelines, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents