Similar Projects
Downtown Watermain Replacement Phase IV
Infrastructure
Bidding
Saint Petersburg, FL 33747

Swing Check Valves Repair - Utilities
Post-Bid
Largo, FL 33778

Equipment Calibration, Repair, and Replacement - Utilities
Post-Bid
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

SR-580 Water Main Tie-Ins
Results
Less than $341,286 est. value
Dunedin, FL 34698

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Structure Tops R and R North County Sugar Bear Trail
Infrastructure
Post-Bid
$876,892 est. value
Clearwater, FL

Water Main Improvements at ALT US 19 to Omaha Street Delaware Avenue to Nebraska Avenue (PID 004017A)
Results
Less than $1,399,413 est. value
Palm Harbor, FL 34683

Rehab of LS 54 and LS 65
Renovation
Construction
Clearwater, FL 33759

Force Main 8 Replacement
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Espiritu Santo Springs and Washington Brennan Subdivisions Water Main Replacement Project
Results
Less than $1,890,000 est. value
Safety Harbor, FL

Lift Station No. 42 Replacement
Renovation
Post-Bid
Saint Petersburg, FL 33716

Design-Build Services, Lift Station 87 Wet Weather Flow Transfer
Results
Saint Petersburg, FL 33731

Odor Control Units - Preventative Maintenance and Repairs
Renovation, Term Contract
Post-Bid
Kenneth City, FL 33709

Reported 12/28/2021 12:00 AM
Project Title

City Of Clearwater Ro1 Bypass Project June 2021

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33755   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of pump station bypass at City’s Water Treatment Plant #1 located at 1657 Palmetto St., Clearwater, FL 33755. Bypass is for underground 6” PVC WM. Bypass is to be above ground on 4ftx10.5ft concrete pad at grade. Above ground bypass piping includes butterfly valve, rupture disc, clamp on saddles for sample tap and pressure gauge, and check valve.

Details

Lift and Pump Stations, Renovation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents