Similar Projects
HVAC and Mechanical Products
Term Contract
Bidding

Construction Management at Risk for Five-Site HVAC System Capital Renewal Project
Bidding
$10,000,000 est. value
Apopka, Orlando, Windermere, FL 32828

Wolf Lake Middle School HVAC and Controls Upgrades
Alteration
Sub-Bidding
Apopka, FL 32712

Continuing HVAC Contracting Services at the Orlando International Airport, Orlando Executive Airport
Post-Bid
Orlando, FL 32827

Removal and Replacement of 75 A/C Rooftop Condensing Units at Maxwell Terrace Apartments - Building 1
Post-Bid
Orlando, FL 32805

City Hall Chiller Replacement, Maintenance and Service
Results
Apopka, FL 32703

Replacement In-Kind of one (1) - Sixty (60) Ton Chiller at the Pompano Turnpike Operations Center
Results
Ocoee, FL 34761

Construction Management at Risk for Wekiva and West Orange High School HVAC Renovations Capital Renewal Project
Bidding
$10,800,000 est. value
Apopka, Winter Garden, FL 32703

HVAC System Replacement, Roof Replacement, Supply and Install Solar Energy System at the OHA Executive Office
Post-Bid
Orlando, FL 32803

A/C Removal ATaS Lab NAWCTSD
Results
Orlando, FL 32826

HVAC Services at The Catholic Charities of Central Florida
Term Contract
Bidding
Orlando, FL 32813

Wolf Lake Middle School HVAC and Controls Upgrades
Post-Bid
$1,600,000 est. value
Orlando, FL 32800

Internal Operations Centre I (IOC I) Communications Room HVAC Improvements
Results
Less than $100,000 est. value
Orlando, FL 32801

HVAC and Mechanical Products and Solutions
Term Contract
Bidding

Air Ductwork Cleaning Services
Post-Bid
Orlando, FL 32827

Last Updated 05/19/2021 06:53 AM
Project Title

South Econ Renaissance Center HVAC Modifications

Physical Address View project details and contacts
City, State (County) Orlando, FL 32829   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $320,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish three (3) existing variable air volume (VAV) terminal boxes currently serving the ballroom, including electrical service devices and portions of associated ductwork. Add a new rooftop air handling unit to serve the ballroom and connect the unit to the existing chilled water system, electrical power system, and Building Automation System (BAS). Includes a new roof equipment curb, new chilled water piping, and new ductwork to connect to existing air distribution system. Replace existing airflow monitoring stations serving AHU-1.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents