Similar Projects
Hillcrest Drainage Improvements Project
Infrastructure
Bidding
$1,500,000 est. value
Mechanicsburg, IL 62545

Site Drainage Work at Eastview Elementary School
Infrastructure
Bidding
$177,000 est. value
Canton, IL 61520

Furn to Stockpile 5,312 Ft Pipe Culv CL C TY 1 (15"-78" EQRS) 97 Each Band CL C TY 1 (15"24") 5 Each End Section CL C TY 1 (36"-54" EQRS)
Post-Bid
Watseka, IL

Pipe, Bands, and End Section
Post-Bid
IL

Replacing a Gabion Wing Wall on Sn 100-5002 at the Intersection of Herrin Road and Collins Road Near Johnston City
Results
Johnston City, IL 62951

Removal and Replacement of A Box Culvert (SN 033-7024) Carrying Il 142 Over A Ditch, 0.1 Miles North of Main Street in Broughton
Results
Broughton, IL 62817

Pipe Culverts
Infrastructure
Bidding
Pittsfield, IL

Furnishing Various Diameters and Lengths of Galvanized Corrugated Steel Culvert Pipe and Precoated Galvanized Corrugated Steel Culvert Pipe
Post-Bid
IL

East Side Drainage Improvements
Results
Gridley, IL 61744

Street and Drainage Improvements North Cherry Street
Infrastructure
Bidding
$200,000 est. value
Breese, IL 62230

FY 2021 Culvert
Post-Bid
IL

Miner Park Judy's Branch Bank Stabilization
Results
Less than $29,010 est. value
Carbondale, Glen Carbon, IL 62034

Contractor - Revetment at Lake Shelbyville Dam
Infrastructure
Bidding
$24,000,000 est. value
Shelbyville, IL

Levee Stabilization - Material Acquisition
Post-Bid
Canton, IL 61520

Regrading a Failed Slope Along IL 251 and Stabilizing the Area with Soldier Piles and Retaining Walls.
Results
IL

Last Updated 05/10/2022 11:42 AM
Project Title

Highway Materials

Physical Address View project details and contacts
City, State (County) Marshall, IL   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

220 Foot Precast Concrete Box Culvert 5' x 3' Furnish To Jobsite 4 Each Precast Box Culvets End Sections Furnish To Jobsite 2 Each Precast Reinforced Concrete Flared End Sections 30" Furnish To Jobsite 272 Foot Pipe Culvert Special 18" Class d Type 1 Corrugated Poly Furnish To Jobsite 56 Foot Pipe Culvert Class d Type 1 30" (Reinforced Concrete) Furnish To Jobsite 456 Foot Pipe Culvert Class d Type 1 15" (Aluminized Steel) Furnish To Jobsite 180 Foot Pipe Culvert Class d Type 1 18" (Aluminized Steel) Furnish To Jobsite 240 Foot Pipe Culvert Class d Type 1 24" (Aluminized Steel) Furnish To Jobsite 65 Sq Yd Erosion Control Blanket Furnish To County Shed 3,013 Foot Perimeter Erosion Barrier Furnish To County Shed 18 Each Inlet & Pipe Protection Furnish To County Shed 874 Ton Stone Riprap Class a4 Fob Quarry 2,285 Ton Stone Riprap Class a3 Fob Quarry 149 Ton Aggregate Surface Course Ca 6 Crushed Stone Fob Quarry 1,340 Ton Trench Backfill Fob Quarry 960 Pound Wheat Furnish To County Shed 1,900 Pound Seeding Class 2 Furnish To County Shed 19 Ton Mulch (Straw) Furnish To County Shed 2,565 Pound Fertilizer Furnish To County Shed 284 Gallon Bituminous Materials Seal Coat Hfp Furnish And Apply 1,000 Gallon Bituminous Materials Seal Coat Hfe 300 Fob Jobsite 7 Ton Seal Coat Aggregate Fob Quarry 4 Ton Seal Coat Aggregate Fob Quarry

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents