Similar Projects
2022 Bond - Proposition A - Brock ISD
New Construction, Infrastructure
Conception
$45,600,000 CJ est. value
Brock, TX 76087

2022 Bond - Proposition C - Brock ISD
Infrastructure
Conception
$700,000 CJ est. value
Weatherford, TX 76087

Target
Renovation - 15,000 SF
Design
$350,000 est. value
Weatherford, TX 76087

Dollar General
New Construction - 10,100 SF
Design
$750,000 est. value
Millsap, TX

College Hill 2.0 MG GST Improvements
Infrastructure
Bidding
$695,000 CJ est. value
Weatherford, TX 76086

Lagoon Reclaimed Water System
Infrastructure
Bidding
$400,000 CJ est. value
Weatherford, TX 76086

Weatherford College Student Housing Facility
New Construction, Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
Weatherford, TX 76086

Walmart Supercenter #963-605 - CAPXREF-1
Renovation
Post-Bid
Weatherford, TX

The District in Willow Park
New Construction - 27,223 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Willow Park, TX 76087

Dollar General
New Construction - 8,800 SF
Construction
$750,000 est. value
Springtown, TX 76082

Boot Barn
Build-Out - 19,592 SF
Construction
$250,000 est. value
Weatherford, TX

Chicken Express
New Construction, Infrastructure - 3,192 SF
Pending Verification
$850,000 CJ est. value
Hudson Oaks, TX 76087

Chick-fil-A #5041 / Main St / Weatherford
New Construction, Infrastructure - 5,587 SF
Pending Verification
$1,200,000 CJ est. value
Weatherford, TX 76086

Bed Bath & Beyond
Renovation - 20,400 SF
Design
Weatherford, TX

Springtown CDBG - Avenue D Reconstruction
Infrastructure
Post-Bid
$500,000 CJ est. value
Springtown, TX 76082

Last Updated 09/26/2022 04:44 PM
Project Title

Sherwin-Williams / Hudson Oaks

Physical Address View project details and contacts
City, State (County) Hudson Oaks, TX 76087   (Parker County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 26, 2022 the project is in design. A building permit has not been issued, and information regarding a general contractor has not been confirmed. Construction start is possible November 2022.

Details

4,500 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents