Similar Projects
RTU 1 and 2 Replacement-Building 700
Alteration
Results
Lawrenceville, GA 30043

Fleet Maintenance Facility HVAC Replacement Project
Alteration
Results
GA

Comprehensive HVAC Services - Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30045

Building Maintenance HVAC
Alteration
Results
GA

Building Maintenance Air Purifiers
Alteration
Post-Bid
GA

Harmony Elementary School HVAC and Classroom Renovations
Renovation, Alteration
Post-Bid
Buford, GA 30519

Radio Tower HVAC Replacement Projects
Alteration
Results
Lawrenceville, GA 30043

Mechanical Equipment Replacement - 2022
Alteration
Post-Bid
$200,000 est. value
Norcross, GA 30071

Georgia Gwinnett College Chilled Water Distribution Phase 2C
Alteration
Post-Bid
$60,000 est. value
Lawrenceville, GA 30043

Harmony Elementary School - HVAC Renovations (ERU And RTU Replacement)
Renovation
Post-Bid
$200,000 CJ est. value
Buford, GA 30519

HVAC System Maintenance, Repair, and Replacement Services
Term Contract
Post-Bid
Lawrenceville, GA 30044

Dacula Middle School - HVAC Modifications
Renovation
Sub-Bidding
$800,000 CJ est. value
Dacula, GA 30019

Collins Hill High School - HVAC Modifications
Renovation
Sub-Bidding
$800,000 CJ est. value
Suwanee, GA 30024

Meadowcreek High School - HVAC Modifications
Renovation
Sub-Bidding
$800,000 CJ est. value
Norcross, GA 30093

Lilburn Middle School - HVAC Modifications
Renovation
Sub-Bidding
$300,000 CJ est. value
Lilburn, GA 30047

Last Updated 03/25/2023 12:04 PM
Project Title

HVAC Modifications At Mason Elementary School

Physical Address View project details and contacts
City, State (County) Duluth, GA 30096   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of replacement of outside air units with new Energy Recovery Units, including removal of related dehumidification water source heat pump units. Proposals received after the above time is called will be returned. No phones will be available. Gwinnett County Public Schools fax machines and computers shall not be used to receive faxes or e-mails for bidders. Contract, if awarded, will be on a lump sum basis. Bids may not be withdrawn for a period of sixty (60) days after the date of receipt of bids. Bids shall be accompanied by a bid bond payable to Gwinnett County Board of Education in an amount equal to five percent of the base bid (Certified Checks NOT Acceptable). Performance Bond and Labor and Material Payment Bond, each amount equal to 100 percent of the contract sum, will be required of the successful bidder. These bonds shall be executed by a Surety Company licensed to do business in the State of Georgia, be listed on Department of The Treasury Circular 570 and have an A.M. Best Company rating of at least Class A, with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents