Similar Projects
Aquatics Center
New Construction - 20,764 SF
Bidding
Griffin, GA

Lenora Park Pool Improvements
Infrastructure
Bidding
Snellville, GA 30039

Competition and Therapy Pool Resurfacing
Post-Bid
Statesboro, GA 30461

Pool Structural Repairs
Post-Bid
Fort Oglethorpe, GA 30742

J078-- Pool and Spa Preventive Maintenance Augusta VAMC
Results
Augusta, GA 30904

Pool Replaster and Tile Update
Results
Less than $136,769 est. value
Albany, GA 31705

Cracker Williams Park Pool Renovations and Repairs
Infrastructure
Bidding
Jesup, GA 31546

FY21 - New Pool House - CMAR
New Construction
Post-Bid
Douglas, GA

2021 Municipal Pool Services
Results
Doraville, GA

Swimming Pool Chemical/General Maintenance
Infrastructure
Post-Bid
Dawsonville, GA

Municipal Pool Services for 2021
Results
Tucker, GA 30084

KSU - Aquatic Structures Maintenance and Repairs
Infrastructure
Post-Bid
Kennesaw, GA 30144

Pool Pak Maintenance and Repair
Term Contract
Results
Savannah, GA

Frances Meadows Aquatic Center Pool Pak Replacement Project
Alteration
Post-Bid
Gainesville, GA

Swimming Pool Maintenance
Results
Atlanta, East Point, GA 30328

Last Updated 03/18/2022 09:12 AM
Project Title

Pool Resurfacing

Physical Address View project details and contacts
City, State (County) GA   (Tift County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $111,606
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: To re-plaster the competition pool at 202 Baldwin drive Tifton Ga. 31793 During the period of 2-5-2022 to 4-29-2022 To be drained by others. Startup procedures to be performed by others, Cut out white plastic beauty strip between monolithic deck and waterline tile. Remove and replace waterline above steps. Apply a taped and tooled polyurethane between new tile and existing monolithic deck. Odyssey 6x6. Remove and replace 12” band of black and blue 2x2 non-skid racing lane tiles, wall targets, and 4” band 2x2 black non-skid tiles at depth break. Clean existing plaster surface to remove any stain or scale that may interfere with bonding agent. Sound out existing plaster. Beat up and remove loose plaster, up to 100 sq. ft. at n/c. * Apply a Membrane C, a waterproofing material in rebar rust areas. Supply and install (3) 12”x12” VGB compliant main drain frame and grates, for main drains. Apply a bond coat, to ensure that new plaster will adhere to existing plaster. Supply and set 2” band of blue non-skid tile trim on steps. Apply approx. 3/8” to ½” average, ‘Sky Blue’ quartz plaster, troweled to a hard, smooth finish, expose quartz aggregate. Remove loose plaster over 100 sq. foot per layer (K) Other items needed

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents