Similar Projects
Roof and Mechanical Unit Replacement
Bidding
Folly Beach, SC 29439

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

HVAC Renovation for Bldg 174 Aerial Delivery Facility
Results
$250,000 to $500,000 est. value
Charleston, SC 29404

Back-up HVAC System for Server Room
Results
Charleston, SC 29415

Convention Center Chiller Plant Equipment Replacement
Post-Bid
North Charleston, SC 29418

Boiler Repair
Results
Charleston, SC 29404

Preventative Maintenance for HVAC Equipment and Components
Term Contract
Post-Bid
Kiawah Island, SC 29455

Remove and Replace 50` of Galvanized Duct Work at the Psychiatry Hospital Auditorium
Results
Less than $6,800 est. value
Charleston, SC

J--Krauss Mri Chillers Servicing
Post-Bid
Charleston, SC 29401

Storm Eye Institute Rooftop Exhaust Fans Replacement
Results
$200,000 to $250,000 est. value
Charleston, SC 29425

J--Krauss MRI Chillers (Brundage) / 534-19-3-2715-0256
Post-Bid
Charleston, SC 29401

Basic Science Building Rooftop Exhaust Fans Replacement
Results
$500,000 to $750,000 est. value
Charleston, SC 29425

District Wide HVAC Water Treatment
Post-Bid
North Charleston, SC

Berry Residence Hall Replacement of 4 Air Cooled Chillers
Results
$309,000 to $391,000 est. value
Charleston, SC 29403

Reported 12/22/2018 12:00 AM
Project Title

Repair Maintenance Facility Bldg 536

Physical Address View project details and contacts
City, State (County) Charleston, SC 29404   (Charleston County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Consists of repairing / replacing HVAC units, distribution systems, and associated piping and drains. Architectural and structural work includes providing necessary work to support the HVAC system. All existing ceilings will be demolished and new ceilings will be installed where impacted by HVAC system replacement. New ceilings will meet all seismic code requirements.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents