Similar Projects
Water Storage Distribution System (WSDS)
Post-Bid
Detroit, MI

Removal of the Underground Storage Tank at the Jackson Street Transportation Facility
Post-Bid
Kalamazoo, MI 49001

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Underground Storage Tank Assessment and Recommendation Services
Infrastructure
Post-Bid
Detroit, MI

2021 Rehab of Brigden Tanks
Results
Battle Creek, MI

Underground Storage Tank System Removal
Infrastructure
Post-Bid
Farmington, MI 48336

Water Treatment Plant Storage Tank Improvements
Results
Big Rapids, MI

150,000 Gallon Water Tank and Scada Improvements, Contract B
Results
Vermontville, MI

South Water Tower
Results
$232,000 est. value
Mason, MI 48854

Contract 1 - Water Tower Improvements
Results
McBain, MI

UST Removal and Site Remediation
Results
Detroit, MI 48213

Cleanout of East Sludge Tank
Infrastructure
Results
Flint, MI

Taylor Meadows Water Heater and Storage Tanks
Infrastructure, Alteration
Results
Taylor, MI 48180

UST Removal and Installation
Infrastructure
Results
Midland, MI 48640

Reported 06/27/2022 08:22 AM
Project Title

5900 - Alger Tank - Inspect, Paint and Restore - Water Replacement - TEMP20077 - City of Grand Rapids

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49507   (Kent County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

5900 - Alger Tank - Inspect, Paint and Restore A detailed scope has not yet been determined This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of June 25, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents