Similar Projects
2022 Bond - Forney Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$1,294,000,000 CJ est. value
Forney, TX 75126

Project Luna / 1111 Akron Way
New Construction, Infrastructure - 278,212 SF
Design
$33,000,000 CJ est. value
Forney, TX 75126

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Lake Ray Hubbard Drive Turn Lane
Infrastructure
Post-Bid
Forney, TX 75126

CIP 2022 Repairs
Infrastructure
Post-Bid
TX

2019-2020 TxCDBG Drainage Improvements
Infrastructure
Results
$171,605 CJ est. value
Kemp, TX 75143

Utilities and Paving Improvements to Serve Falcon Heights Village 1
Infrastructure
Results
TX

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Construction
$696,000 CJ est. value
Kaufman, TX 75142

The Learning Experience
New Construction, Infrastructure - 10,000 SF
Construction
$1,900,000 CJ est. value
Forney, TX 75126

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Forney Marketplace - Lot 8
New Construction, Infrastructure - 8,400 SF
Design
$1,848,000 est. value
Forney, TX 75126

Construction of the Grading Improvements or Wildcat Ranch, Phase 4
Infrastructure
Post-Bid
TX

Utilities and Paving Improvements to Serve Devonshire Village 20
Infrastructure
Results
TX

Forney Crossing
New Construction, Infrastructure - 78,500 SF
Construction
$14,000,000 CJ est. value
Forney, TX 75126

Last Updated 06/06/2023 05:12 AM
Project Title

Medora-Cottage Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Terrell, TX 75160   (Kaufman County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023009882 Project Name: Medora-Cottage Sidewalk Improvements Project Number: TABS2023009882 Facility Name: South Medora Street Location Address: South Medora Street Terrell, TX 75160 Location County: Kaufman Start Date: 1/23/2023 Completion Date: 5/31/2023 Estimated Cost: $141,105 Type of Work: New Construction Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: The work consists of constructing reinforced concrete sidewalk, ADA accessible ramps, driveway approaches, crosswalks, removal of old concrete, and miscellaneous items of work. Square Footage: 4,832 ft 2 ______________________ The City of Terrell will receive bids for Medora-Cottage Sidewalk Improvements Work consists of constructing reinforced concrete sidewalk, ADA accessible ramps, driveway approaches, crosswalks, removal of old concrete, and miscellaneous items of work. A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the City of Terrell or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Department of Labor and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, age, sexual identity, gender identity or national origin. Adherence to the grant recipient's Section 3 Policy is required for contracts and subcontracts in excess of $100,000.00. The lobbying certification must be submitted with the bid packet to be considered complete and responsive. The City of Terrell is an equal opportunity employer. The City of Terrell reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by City of Terrell for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. City of Terrell Mayor Rick Carmona Ad dates: 10/01/22, 10/08/22, 10/15/22 All contractors/subcontractors that are debarred, suspended or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents