Similar Projects
Stormwater Drainage Culvert Replacement Project
Post-Bid
Collegedale, TN

Three-Year Contract for Underground Utilities Locating Services
Term Contract
Post-Bid
Chattanooga, TN 37402

Jane Cove Culvert Replacement
Results
$30,000 to $40,000 est. value
Signal Mountain, TN 37377

Stream Bank Restoration Project
Results
Signal Mountain, TN 37377

Spring Valley Bank Stabilization
Post-Bid
Chattanooga, TN 37402

The Sweeping and Drain Cleaning on Various Interstate and State Routes
Results
TN

Moccasin Bend Bank Stabilization
Post-Bid
$1,000,000 to $5,000,000 est. value
Chattanooga, TN

Repair of The Discharge Structures for Little Chickey Pond
Results
Lakesite, TN 37379

Corrugated Metal Pipe
Term Contract
Post-Bid
Chattanooga, TN

Stormwater Project
Results
Less than $38,800 est. value
Signal Mountain, TN 37377

Concrete Culvert 2021
Term Contract
Post-Bid
TN

Signal Mountain High School Track Drainage Improvements
Results
Signal Mountain, TN 37377

Cannon Avenue Drainage Improvements
Post-Bid
Chattanooga, TN 37403

USDA NRCS EWP Arbor Creek Way
Results
Chattanooga, TN

Brannon Avenue Drainage Improvements
Post-Bid
Chattanooga, TN 37407

Reported 09/10/2021 12:00 AM
Project Title

TWRA Hiwassee Pond Liners

Physical Address View project details and contacts
City, State (County) Birchwood, TN   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor is to furnish and install a 45-mil thick, scrim-reinforced polypropylene liner. The geomembrane shall be manufactured by the calendaring process, consisting of first quality ingredients, suitably compounded, of which polypropylene is the principle resin. The finished compound should be uniform in color, thickness, size, and surface texture with maximum UV protection. Installation shall be in all respects performed according to manufacturer specifications.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents