Similar Projects
Reported | 09/10/2021 12:00 AM |
Project Title | TWRA Hiwassee Pond Liners |
Physical Address | View project details and contacts |
City, State (County) | Birchwood, TN (Hamilton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor is to furnish and install a 45-mil thick, scrim-reinforced polypropylene liner. The geomembrane shall be manufactured by the calendaring process, consisting of first quality ingredients, suitably compounded, of which polypropylene is the principle resin. The finished compound should be uniform in color, thickness, size, and surface texture with maximum UV protection. Installation shall be in all respects performed according to manufacturer specifications. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |