Similar Projects
2021 Bond Program
New Construction, Renovation
Conception
Phoenix, AZ

New Dysart Elementary School 1
New Construction
Conception
AZ

Two Head Start/Early Childhood Education Buildings
New Construction
Design
San Carlos, AZ

Blue School Flood Control
Infrastructure
Design
$290,000 CJ est. value
Clifton, AZ 85533

RFQ - Architectural Services
Term Contract
Bidding
Rio Rico, AZ 85648

Replace Up to 3 Fire Panels / Fire Systems Among 3 Schools
Renovation
Sub-Bidding
$60,000 CJ est. value
Bullhead City, AZ 86429

Trash Collection Services
Term Contract
Sub-Bidding
Tuba City, AZ 86045

Kiva Elementary School Rebuild/Remodel
New Construction
Post-Bid
$18,500,000 est. value
Paradise Valley, AZ 85253

Weatherization, Roofing, and Structural Repairs Project at Faras Elementary
Renovation
Post-Bid
Pirtleville, AZ

New Killip Elementary School
Results
Less than $19,500,000 est. value
Flagstaff, AZ 86004

Garden Lakes Elementary School Renovations
Renovation
Results
$2,250,000 est. value
Avondale, AZ 85392

Cross of Glory School Addition
Addition
Construction
$17,860 est. value
Peoria, AZ 85383

General Contractors for the Demolition, Renovations and New Space at Pima Elementary School
Renovation, Demolition
Construction
$3,850,000 est. value
Pima, AZ 85543

New Dysart Elementary School 2
Demolition
Conception
AZ

Ventilation and Plumbing Improvements Multi-Site
Renovation
Design
Glendale, AZ 85301

Last Updated 08/10/2022 07:03 AM
Project Title

500 Wing Remodel AHS

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85705   (Pima County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All bids were rejected from the School District. Don’t know if they are going to reput it out for bid. Project Scope: 1. Scope of Work – 500 Wing at Amphitheater HS A. Restroom ADA Renovation ? Student Center restroom renovation for compliance with the DOJ's 2010 ADA Standards for Accessible Design and ICC A117.1 B. Renovation of 500 Wing Classroom: ? Converting abandoned classroom space into student career center ? Addition of kitchenette C. Monolith structure at entry and smaller ones at site entry and as a sign out by Stone Ave. All questions must be submitted EST on 25 April 2022 The estimated value is between $500,000 to $1,000,000. The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents