Similar Projects
Grease Trap and Oil-Water Separator Inspection, Service, and Testing
Term Contract
Design
$25,000 to $100,000 est. value
Fort Leavenworth, KS

Construction Inspection IDIQ
Post-Bid

Construction Inspection Services
Post-Bid

Engineering, Planning and Development
Post-Bid

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

2022 Bridge Inspection and Asset Management Services
Alteration
Post-Bid
Leavenworth, KS

Regional Transportation Capital Improvement Plan
Alteration
Post-Bid
Leavenworth, KS

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Post-Bid

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Professional Engineering Services for Preparation of Design-Bid-Build Documents and Design-Build Request for Proposals for Various Projects Types at DOD and Non-DOD Activities
New Construction, Renovation, Term Contract
Post-Bid
Less than $30,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Electrical Distribution System - Three Year Inspection and Arc Flash Hazard Analysis
Term Contract
Post-Bid
Leavenworth, KS 66048

Reported 02/12/2022 12:00 AM
Project Title

E-18 Bridge Replacement Construction Engineering Inspection Services

Physical Address View project details and contacts
City, State (County) Easton, KS 66020   (Leavenworth County)
Category(s) Professional Services
Sub-Category(s) Engineering, Inspection Services
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Construction Engineering (inspections) Services and perform a pre-construction site improvements analysis report for the E-18 Bridge Replacement project (Reinforced concrete haunched slab on pile bent abutment) Bridge E-18, 231ST Street over Dawson Creek, Approximately 0.7 miles South of Easton, Kansas.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents