Reported | 07/31/2019 08:44 AM |
Project Title | Zion Crossroads Water Booster Station and Wastewater Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Palmyra, VA (Fluvanna County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | |
Project Status | Construction Commenced first quarter 2019, No Sub Bids Needed |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the installation of approximately 22,921 lf of 12" waterline, 9,825 lf of 10" force main, 12,412 lf of 8" force main, including multiple directional drills and horizontal bores installing casing pipe and carrier pipe, all necessary valves, appurtenances and connections to the existing 12" water line near the intersection of Route 250 and Route 15. This project also consists of connecting into new water lines and force mains being installed under simultaneous projects "Zion Crossroads Water Booster Pump Station and Wastewater Pump Station, and "Zion Crossroads Elevated Storage Tank" (collectively the "Other Projects"). These Other Projects are under separate contracts and Contractor will be responsible for coordination with the Other Projects and associated contractors. A. This project shall consist of two phases. B. Phase 1 shall consist of all work associated with the construction, inspection, testing, completion, and acceptance of the following: i. Waterline A from STA WA9+87.47 to STA WA155+28.95 ii. Waterline C from STA WC10+00 to STA WC12+28.10 iii. Waterline D from STA WD10+00 to STA WD55+44.33 | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |